Albermarle gets environmental nod for lithium plant

  • Market: Metals, Oil products
  • 09/11/18

US-based lithium and speciality chemicals producer Albermarle has received environmental approval for the development of a lithium hydroxide plant near Bunbury in the southwest of Western Australia (WA).

While the company is still awaiting some other approvals before making a final investment decision on the plant, which is allowed to produce up to 100,000 t/yr, approval by WA's Environmental Protection Authority is seen as a major step forward for the proposed project, estimated to cost around A$1bn ($723mn).

Albermarle, headquartered in Charlotte, North Carolina, owns 50pc of Talison Lithium, which owns and operates the Greenbushes mine, the world's largest producer of hard rock lithium concentrate. The other shareholder is China's Tianqi Lithium, which is building a A$700mn lithium hydroxide plant at Kwinana, south of Perth. Albermarle also has significant lithium operations in Chile, the world's largest lithium brine producer.

Albermarle and Tianqi have spent A$320mn on expanding Greenbushes' capacity and are planning to invest a further $600mn to boost lithium concentrate output to 2.3mn t/yr from 2021.

It is expected that Albermarle will develop five lithium hydroxide "trains", each with a capacity of 20,000 t/yr in a staged development over a few years.

Already the world's biggest supplier of hard rock lithium, WA is increasingly becoming a premier location for downstream lithium conversion, with the main focus on lithium hydroxide. Kidman Resources and its joint-venture partner Chile's SQM have announced plans for a 45,000 t/yr lithium hydroxide plant at Kwinana and Perth-based resources firms Neometals and Mineral Resources are also planning plants.

Battery producers are increasingly preferring lithium hydroxide rather than lithium carbonate for cathodes as it gives batteries greater energy density, capacity and longer life. Concentrate from hard rock lithium can be directly converted into lithium hydroxide, while concentrate from lithium brine must be converted into lithium carbonate before it can be made into lithium hydroxide.

The WA government has established a special lithium and battery materials taskforce to take advantage of the state's lithium production status, along with its output of nickel and cobalt.


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
28/03/24

Crane barge arriving at Baltimore bridge tonight

Crane barge arriving at Baltimore bridge tonight

Houston, 28 March (Argus) — The first major piece of equipment capable of beginning to clear the blocked Port of Baltimore, Maryland, is expected to arrive onsite tonight. The Chesapeake 1000 crane barge, capable of lifting 1,000 short tons with its a 231ft-long boom, is expected to arrive at the site of the collapsed Francis Scott Key Bridge near Baltimore at 11pm ET on 28 March, the US Coast Guard (USCG) told Argus . Both the crane and the tug pulling it, Atlantic Enterprise , are owned by Donjon Marine. It is currently the only crane on route to the collapsed bridge, the USCG said. There is no official timetable for the reopening of the port after the Interstate 695 highway bridge over the Patapsco River was hit in the early hours of 26 March by a container ship and collapsed, with the debris and ship blocking the waterway. The operator of the ship, Maersk, has contracted with marine salvage company Resolve Marine to refloat the vessel and remove it from the area, according to the USCG. It is not clear who has contracted for the Chesapeake 1000. Despite the inbound crane, it could take weeks or even months to clear debris and reopen the waterway under the collapsed bridge according to a engineering professor at the nearby Johns Hopkins University. By Nathan Risser Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Read more
News

'Weeks, months' to reopen Baltimore waterway: professor


28/03/24
News
28/03/24

'Weeks, months' to reopen Baltimore waterway: professor

Houston, 28 March (Argus) — It could take weeks or even months to clear debris and reopen the waterway under the collapsed Francis Scott Key Bridge in Baltimore, Maryland, according to a engineering professor at the nearby Johns Hopkins University. As of Wednesday, there was no official timetable for the reopening of the Port of Baltimore after a major highway bridge over the Patapsco River was hit in the early hours of 26 March by a container ship and collapsed, with the debris and ship blocking the waterway. "I'd be shocked if it's weeks, but I don't think it'll take even a year" to clear the waterway, structural engineer and Johns Hopkins professor Benjamin Schafer said Wednesday. He expects the rebuild of the bridge to take significantly longer. "I've lived through quite a few civil infrastructure projects and they're rarely less than 10 years. So I think that's what we're looking at," Schafer said. He noted that it took five years to build the original Francis Scott Key Bridge and seven years to repair the Sunshine Skyway Bridge in Tampa Bay, Florida, after a similar collapse in 1980. Still, "this is definitely not a national supply chain crisis," John Hopkins operations management professor Tinglong Dai said Wednesday. "The effect will be mostly local, mostly minimal and mostly temporary." The bridge collapse and port closure is also unlikely to trigger a global supply chain crisis, he said. The Port of Baltimore is an important but "niche" port specializing in automobile imports and exports, Dai added. "The supply chain has evolved...I have already seen a lot of rerouting happening." Automakers started adjusting their supply routes away from the top port for US vehicle imports the day of the collapse, including General Motors, Ford and Mercedes-Benz. Baltimore is also a major port for coal exports, which may start to shift to terminals to the south in Hampton Roads, Virginia. Freight rates for ships that carry coal could see increases in global markets Other commodities like asphalt and caustic soda that move through the port will see challenges, while organic agriculture imports may see less problems due to seasonal flows. By Nathan Risser Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Baltimore probe includes potential contaminated fuel


28/03/24
News
28/03/24

Baltimore probe includes potential contaminated fuel

New York, 28 March (Argus) — Federal authorities are examining whether the containership that crashed into the Francis Scott Key Bridge in Baltimore, Maryland, was burning contaminated marine fuel at the time of the incident. The National Transportation Safety Board (NTSB) said it will collect a sample of the fuel on board the 116,851-dwt container vessel Dali as part of its investigation into why the ship lost power and hit the bridge support early on 26 March, taking down the span. "That sample will be taken, and we will analyze the quality, any sort of contaminants, we will look at viscosity," NTSB chair Jennifer Homendy said this week. "That will be part of our investigation." Shipboard power is generally generated by turbines connected to the same engines driving propulsion. There are a number of issues related to fuel that could have led to a loss of power on the ship, according to Wajdi Abdmessih, chief executive at Seahawk Services, a marine fuel testing company based in New Jersey. The fuel on the ship could have been contaminated, as was the case last year when contaminated very low-sulphur fuel oil was found on a number of ships fueld through a Houston, Texas, bunkering operation, or it could have been a compatibility issue with the vessel's engine, where the fuel was not optimized for the equipment. "If the vessel switches between different types of fuels, compatibility and stability issues could occur, which may cause a problem with the engine," Abdmessih said. "Unstable fuel could cause increased sludging and high sediment, which could clog the filter and cause fuel starvation and engine downturns." Singapore-based Synergy Marine Group, which manages Dali , said it is taking part of this investigation but declined to comment possible causes of the accident, including possible fuel contamination. The pilots on board the vessel lost control because of a loss of propulsion, according to the Maritime and Port Authority of Singapore (MPA), which is assisting in the investigation because Dali was sailing under the Singapore flag. An issue with the ship's propulsion and auxiliary machinery was discovered during its June 2023 inspection in San Antonio, Chile , according to Equasis, a vessel information database. The problem involved the vessel's gauges and thermometers, according to the data. Its most recent inspection was in September 2023, but there are no indications of issues from the inspection. The vessel's next inspection was due in June 2024, the MPA said. By Luis Gronda Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Europe plate: Imports weigh on EU prices


28/03/24
News
28/03/24

Europe plate: Imports weigh on EU prices

London, 28 March (Argus) — Plate prices in Europe tumbled this week on increased import activity, which has pushed European producers to adjust their offers down to remain competitive. The Argus fortnightly Italian plate assessment dropped by €22.50/t to €730/t ex-works today for S235 grades, while the northwest European plate assessment for the same specifications also dropped by €15/t to €765/t. In the south, for S275 material, re-rollers were heard quoting €740-750/t to small customers, with €720-730/t possible for larger volumes. The market remained split between suppliers willing to drop to the low €700s/t to collect orders, and others that preferred to remain firm at €740-750/t and wait for after the Easter holidays to see how the market develops. Two re-rollers confirmed this week that they are mulling extending their Easter break by a few days owing to weak purchasing activity in the market. The level of €710/t ex-works for S275 was also reported available for orders of 1,000t and above, but this could not be verified. Buying activity over the past two weeks remained poor, as market participants are purchasing what they need with no restocking activity occurring. A slight drop in slab prices has contributed to lower plate prices. Deliveries for the Italian domestic market remain for late April for commodity grades. To the rest of Europe, Italian producers were heard offering around €750/t on a ex-works basis for S235 material, without collecting any tonnage. One source said there were offers as high as €760-770/t ex-works Italy. In northern Europe, one mill was reported concluding sales to end-users working in the shipbuilding industry at €750-770 ex-works for S355 grades. The same producer tabled offers at around €780/t, but was quick to offer discounts. Orders from the supplier are expected to be delivered in six to seven weeks. One source estimated that for S235, integrated mills would be offering close to €780-800/t ex-works, while from re-rollers located in the Benelux area €750/t ex-works for the same grade could be easily achieved. One central European mill was also heard available to sell at €790-810/t ex-works for S235. Producers in the northwest are operating on April to May delivery depending on the mill and the product requested. Market participants agree that a rebound in market activity is only expected towards the latter part of April. On imports, over the past couple of weeks, Indonesian material was purchased by buyers across the continent, especially in southern Europe at €640/t cif levels for S275. One source estimated that sales from Indonesia totalled close to 60,000t over the past month. After this activity, Indonesian material was not reported available over the past seven days. One deal was also concluded this week at €710/t cfr north EU, for South Korean S355 material. From South Korea, offers for S275 were estimated over the €660/t cif Italy level this week, with no deals concluded. Indian material was offered at $710-720/t cfr Italy for S275, while one trader offered the same origin from port, free on truck at €730/t for S355. Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Turkey rebar: Market muted ahead of elections


28/03/24
News
28/03/24

Turkey rebar: Market muted ahead of elections

London, 28 March (Argus) — Turkish rebar prices were stable today, without a great deal of urgency shown by export buyers following a sustained uptick in scrap prices over the past few days. The domestic market remained subdued, as construction demand is still constrained by high borrowing costs and the ongoing depreciation of the domestic currency. Argus ' daily Turkish export assessment for rebar was unchanged at $590/t fob, with larger cargoes still available at this level. European, mostly Balkan, buyers have been making enquiries this week, with scrap prices inching steadily upwards over the past three weeks. But buyers have mostly been checking prices, and trade has remained thin. Rebar indications from suppliers were in a $590-605/t fob range, with most suppliers expecting at least $595/t fob. In the wire rod segment, material was available in a range of $605-625/t fob. The weekly wire rod assessment increased by $5/t to $600/t fob Turkey. In the domestic market, offers from most mills in the Marmara and Iskenderun regions were firm in a range of $610-620/t ex-works excluding value-added tax (VAT). But material remains available from Izmir mills and one Marmara mill at $595-600/t ex-works. While some buyers have made purchases in the run-up to the municipal elections on 30 March, restocking has been lacklustre, with a lack of firm signals from the construction sector. Argus ' daily Turkish domestic rebar assessment was unchanged at $600/t ex-works excluding VAT, with the lira equivalent also unchanged at TL23,4000/t ex-works including VAT. Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more