Tetco FM will crimp southbound Appalachian gas flows
A force majeure on Enbridge's Texas Eastern Transmission (Tetco) natural gas pipeline may tighten southbound flow capacity from Appalachia this summer.
The force majeure declared 28 May requires Tetco to have a 20pc pressure restriction on lines 10 and 15 at the Owingsville, Kentucky, compressor station, where a May 2020 explosion took place. This will limit Owingsville flows to less than 1 Bcf/d and will impact the entire 30-inch line between Uniontown, Pennsylvania, and Kosciusko, Mississippi.
Effective today, Uniontown capacity will be limited to 2.6 Bcf/d (74mn m³) while the Danville compressor station in Kentucky will range from 966mn-1.256 Bcf/d.
Additionally, Uniontown will be capped at 2.7 Bcf/d from 2-6 June and will fall to 1.85 Bcf/d from 18-25 June.
The force majeure was ordered by the Pipeline and Hazardous Materials Safety Administration (PHMSA) because it declined the renewal of a rolling 90-day permit approval to run the system at maximum pressure between Kosciusko and Uniontown.
Related news posts
Business intelligence reports
Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.
Learn more