ExxonMobil hits Guyana oil output goal

  • Spanish Market: Crude oil
  • 21/12/20

ExxonMobil reached targeted crude production of 120,000 b/d at the Liza 1 well on Guyana's deepwater Stabroek block, a milestone that had been delayed by an earlier re-injection glitch and equipment delays.

The target was achieved a year after start-up of the Liza Destiny floating production, storage and offloading (FPSO) vessel, with the company targeting full production of 32.1°API Liza crude in first quarter 2020.

"We are disappointed by the number of equipment issues experienced and that, because of these issues and Covid-19, commissioning of the gas injection system took longer than originally projected," ExxonMobil Guyana president Alistair Routledge said.

In welcoming the output milestone, Guyana's natural resources minister Vickram Bharrat did not refer to delays in the lifting of the country's crude entitlement caused by the production delays. A fourth 1mn bl cargo had been scheduled to be lifted in mid-December. The natural resources ministry did not respond to a request for comment on a new lifting schedule.

In subsequent stages, ExxonMobil plans to expand Guyana offshore flows to 750,000 b/d in 2026.

Border signal

Guyana's oil production is rising against the backdrop of a new legal development in the country's 120-year-old territorial dispute with neighboring Venezuela.

In an 18 December ruling, the International Court of Justice (ICJ) said it has jurisdiction to hear Guyana's case seeking validation of its boundary with Venezuela.

The festering dispute is a legacy of British colonialism in Guyana. Caracas has long claimed sovereignty over the Essequibo region that makes up the western two thirds of Guyana, including oil-prone maritime territory.

Venezuela's navy in 2013 seized a research vessel working in the Roraima block under contract from US independent Anadarko. The vessel and the crew were released after a week.

In December 2018, ExxonMobil suspended seismic surveys on a part of Stabroek after a research vessel it contracted was approached by a Venezuelan navy ship. ExxonMobil said the incident would not interrupt its long-term drilling and development operations.

The Hague-based ICJ's announcement comes a month after the head of Guyana's army said no foreign forces will again be allowed to "target" the country's oil exploration and production operations.

"The court's decision means international law can be brought to bear to ensure that Guyana's patrimony is preserved," President Irfaan Ali said.

The ruling was rejected by Venezuela's foreign minister Jorge Arreaza who said the ICJ had no jurisdiction in a matter that should be discussed bilaterally with Guyana.

No schedule has been fixed by the court for the hearing of the substantive case.


Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

02/05/24

Shell's 1Q profit supported by LNG and refining

Shell's 1Q profit supported by LNG and refining

London, 2 May (Argus) — Shell delivered a better-than-expected profit for the first quarter of 2024, helped by a strong performance from its LNG and oil product businesses. The company reported profit of $7.4bn for January-March, up sharply from an impairment-hit $474mn in the previous three months but down from $8.7bn in the first quarter of 2023. Adjusted for inventory valuation effects and one-off items, Shell's profit came in at $7.7bn, 6pc ahead of the preceding three months and above analysts' estimates of $6.3bn-$6.5bn, although it was 20pc lower than the first quarter of 2023 when gas prices were higher. Shell's oil and gas production increased by 3pc on the quarter in January-March and was broadly flat compared with a year earlier at 2.91mn b/d of oil equivalent (boe/d). For the current quarter, Shell expects production in a range of 2.55mn-2.81mn boe/d, reflecting the effect of scheduled maintenance across its portfolio. The company's Integrated Gas segment delivered a profit of $2.76bn in the first quarter, up from $1.73bn in the previous three months and $2.41bn a year earlier. The segment benefited from increased LNG volumes — 7.58mn t compared to 7.06mn t in the previous quarter and 7.19mn t a year earlier — as well as favourable deferred tax movements and lower operating expenses. For the current quarter, Shell expects to produce 6.8mn-7.4mn t of LNG. In the downstream, the company's Chemicals and Products segment swung to a profit of $1.16bn during the quarter from an impairment-driven loss of $1.83bn in the previous three months, supported by a strong contribution from oil trading operations and higher refining margins driven by greater utilisation of its refineries and global supply disruptions. Shell's refinery throughput increased to 1.43mn b/d in the first quarter from 1.32mn b/d in fourth quarter of last year and 1.41mn b/d in January-March 2023. Shell has maintained its quarterly dividend at $0.344/share. It also said it has completed the $3.5bn programme of share repurchases that it announced at its previous set of results and plans to buy back another $3.5bn of its shares before the company's next quarterly results announcement. The company said it expects its capital spending for the year to be within a $22bn-$25bn range. By Jon Mainwaring Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

US Fed signals rates likely to stay high for longer


01/05/24
01/05/24

US Fed signals rates likely to stay high for longer

Houston, 1 May (Argus) — Federal Reserve policymakers signaled they are likely to hold rates higher for longer until they are confident inflation is slowing "sustainably" towards the 2pc target. The Federal Open Market Committee (FOMC) held the federal funds target rate unchanged at a 23-year high of 5.25-5.5pc, for the sixth consecutive meeting. This followed 11 rate increases from March 2022 through July 2023 that amounted to the most aggressive hiking campaign in four decades. "We don't think it would be appropriate to dial back our restrictive policy stance until we've gained greater confidence that inflation is moving down sustainably," Fed chair Jerome Powell told a press conference after the meeting. "It appears it'll take longer to reach the point of confidence that rate cuts will be in scope." In a statement the FOMC cited a lack of further progress towards the committee's 2pc inflation objective in recent months as part of the decision to hold the rate steady. Despite this, the FOMC said the risks to achieving its employment and inflation goals "have moved toward better balance over the past year," shifting prior language that said the goals "are moving into better balance." The decision to keep rates steady was widely expected. CME's FedWatch tool, which tracks fed funds futures trading, had assigned a 99pc probability to the Fed holding rates steady today while giving 58pc odds of rate declines beginning at the 7 November meeting. In March, Fed policymakers had signaled they believed three quarter points cuts were likely this year. Inflation has ticked up lately after falling from four-decade highs in mid-2022. The consumer price index inched back up to an annual 3.5pc in March after reaching a recent low of 3pc in June 2023. The employment cost index edged up in the first quarter to the highest in a year. At the same time, job growth, wages and demand have remained resilient. The Fed also said it would begin slowing the pace of reducing its balance sheet of Treasuries and other notes in June, partly to avoid stress in money markets. By Bob Willis Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Cenovus boosts oil sands output by 4pc in 1Q


01/05/24
01/05/24

Cenovus boosts oil sands output by 4pc in 1Q

Calgary, 1 May (Argus) — Canadian integrated Cenovus Energy increased its oil sands production by 4pc in the first quarter, led by gains at Lloydminster Thermal and Foster Creek heavy crude assets, and the company plans to boost output further to supply the newly opened Trans Mountain Expansion (TMX) pipeline. Cenovus pumped out 613,000 b/d of crude from its oil sands projects in Alberta, up from 588,000 b/d in the same quarter last year, the Calgary-based company reported on Wednesday. This was one of the highest producing quarters for Cenovus' oil sands assets since acquiring Husky in early 2021, second only to the 625,000 b/d produced in the fourth quarter that year. Cenovus has a commitment of about 144,000 b/d on the newly completed 590,000 b/d TMX pipeline, which was placed into service on Wednesday , and the company has plans to push upstream output higher over the next several years across its portfolio to meet its commitment. The pipeline nearly triples the amount of Canadian crude that can reach the Pacific coast without first having to go through the US. First-quarter production from the Lloydminster Thermal segment rose to 114,000 b/d, up from 99,000 b/d a year earlier, because of higher reliability, according to Cenovus. Cenovus' Foster Creek production rose to 196,000 b/d of bitumen, up from 190,000 b/d in first quarter 2023. The company plans to bring another 30,000 b/d online at the steam-assisted gravity drainage (SAGD) asset by the end of 2027 through optimization projects. To the north, Christina Lake's first-quarter bitumen output of 237,000 b/d was steady with previous quarters. The asset is expected to get a significant boost by the end of 2025 when a pipeline connecting the project to output from the neighbouring Narrows Lake asset is completed. The 17 kilometer (11 mile) Narrows Lake tie-back will add 20,000-30,000 b/d of bitumen to Christina Lake, which already ranks as the industry's largest SAGD project. The pipeline is 67pc complete and should be placed into service in early 2025, Cenovus executives said Wednesday on an earnings call. Northeast of Fort McMurray, Alberta, new well pads are planned at Sunrise in 2025, where Cenovus also plans to push production higher by 20,000 b/d. Sunrise produced an average of 49,000 b/d in the first quarter this year, up from 45,000 b/d in the same quarter 2023. Cenovus' output company-wide rose to 801,000 b/d of oil equivalent (boe/d) in the first quarter, up from 779,000 boe/d a year earlier. This includes oil sands, natural gas liquids, natural gas, conventional and offshore assets. Cenovus posted a profit of C$1.2bn ($871mn) in the quarter, up from a C$636mn profit during the same quarter of 2023. By Brett Holmes Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Tankers can take TMX crude mid-May: Trans Mountain


01/05/24
01/05/24

Tankers can take TMX crude mid-May: Trans Mountain

Calgary, 1 May (Argus) — Commercial operations for the 590,000 b/d Trans Mountain Expansion (TMX) crude pipeline in western Canada have officially started today, but tankers will not be able to load crude from the line until later this month. Line fill activities, which began on 16 April, are still ongoing for the C$34bn ($25bn) project that stretches from Edmonton, Alberta, to the docks in Burnaby, British Columbia. About 70pc of the volumes needed are in the 1,181 kilometre (733 mile) line, Trans Mountain said on Wednesday. "As of today, all deliveries for shippers will be subject to the Expanded System tariff and tolls, and tankers will be able to receive oil from Line 2 by mid-May," Trans Mountain said. Aframax-size crude tankers started to take position on the west coast last month in anticipation of the new line. But the inability to deliver crude at Burnaby, while still having to pay full tolls, was a concern raised by several shippers on 23 April. "Trans Mountain must be able to receive, transport and deliver a shipper's contract volume," the shippers said in a letter to the CER. The ability to deliver the crude is "clearly central and fundamental qualities of firm service." The CER in November approved interim tolls for the system that will further connect Albertan oil sands producers to Pacific Rim markets. Shippers will, at least initially, pay C$11.46/bl to move crude from Edmonton, Alberta, to the Westridge terminal in Burnaby, British Columbia. The fixed portion accounts for C$10.88/bl of this and has nearly doubled from a C$5.76/bl estimate in 2017. The Canada Energy Regulator (CER) on 30 April gave Trans Mountain a green light to put TMX into service , ending years of uncertainty that the project would ever be completed. The expansion project, or Line 2, nearly triples the capacity of Canadian crude that can flow to the Pacific coast, complementing the original 300,000 b/d line, or Line 1, that has been operating since 1953. By Brett Holmes Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Canada’s TMX pipeline ready to move crude: Update


30/04/24
30/04/24

Canada’s TMX pipeline ready to move crude: Update

Adds regulatory approvals received. Calgary, 30 April (Argus) — Canada's 590,000 b/d Trans Mountain Expansion (TMX) crude pipeline can now start moving volumes to the Pacific coast after receiving final regulatory approvals today, more than a decade after the project was first conceived. The Canada Energy Regulator (CER) approved Trans Mountain's final applications on Tuesday, giving the midstream company a green light to put its C$34bn ($25bn) project into service. Trans Mountain had recently maintained its commitment to being ready by 1 May. The expansion nearly triples the existing 300,000 b/d Trans Mountain line that runs from Edmonton, Alberta, to Burnaby, British Columbia. Also expanded was the Westridge Marine Terminal from one dock to three, all capable of loading Aframax-sized vessels. The line will provide Canadian oil sands producers with a significant export outlet without having to first go through the US. Much of the new volume to flow on TMX is expected to be heavy sour crude. Federally-owned Trans Mountain had submitted applications as recent as 15 April for the final section of the pipeline about 140 kilometers (87 miles) east of the line's terminus in Burnaby. The final applications concerned piping, valves and other components at two pipeline inspection device traps and the mainline pipe between the two traps. The traps were added for safety assurance when the operator was allowed by CER to use a smaller diameter pipe as part of the Mountain 3 deviation. Mountain 3 was the last segment of the pipeline to be constructed because of delays relating to difficult terrain while tunneling. The "golden weld" marking the end of construction occurred on 11 April, according to Trans Mountain. A group of shippers last week expressed concern that TMX would not be ready for commercial service by 1 May. The pipeline had been marred by legal challenges and cost over-runs since it was first proposed in 2013 by its then-owner US midstream firm Kinder Morgan. The Canadian government took ownership of it in 2018. By Brett Holmes Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more