Brazil beats 2021 power expansion goal by 58pc

  • Spanish Market: Electricity, Natural gas
  • 07/01/22

Brazil added 7,562 MW to its power capacity matrix in 2021, according to data from Brazilian national power regulatory agency Aneel.

That is the second-highest yearly increase in Aneel's records, only falling behind 2016's increase of 9,528 MW, and 58pc ahead of the 4,790 MW 2021 expansion goal, established last January.

Thermoelectric power accounted to 32pc of the total capacity added, while wind and solar expansions were at 49pc and 17pc, respectively. September was the month with the highest increase, with 1,798 MW added to the matrix — 1,338.30 MW of which came from the launching of natural gas GNA 1 plant, the second biggest thermoelectric in the country.


Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

02/05/24

Shell's 1Q profit supported by LNG and refining

Shell's 1Q profit supported by LNG and refining

London, 2 May (Argus) — Shell delivered a better-than-expected profit for the first quarter of 2024, helped by a strong performance from its LNG and oil product businesses. The company reported profit of $7.4bn for January-March, up sharply from an impairment-hit $474mn in the previous three months but down from $8.7bn in the first quarter of 2023. Adjusted for inventory valuation effects and one-off items, Shell's profit came in at $7.7bn, 6pc ahead of the preceding three months and above analysts' estimates of $6.3bn-$6.5bn, although it was 20pc lower than the first quarter of 2023 when gas prices were higher. Shell's oil and gas production increased by 3pc on the quarter in January-March and was broadly flat compared with a year earlier at 2.91mn b/d of oil equivalent (boe/d). For the current quarter, Shell expects production in a range of 2.55mn-2.81mn boe/d, reflecting the effect of scheduled maintenance across its portfolio. The company's Integrated Gas segment delivered a profit of $2.76bn in the first quarter, up from $1.73bn in the previous three months and $2.41bn a year earlier. The segment benefited from increased LNG volumes — 7.58mn t compared to 7.06mn t in the previous quarter and 7.19mn t a year earlier — as well as favourable deferred tax movements and lower operating expenses. For the current quarter, Shell expects to produce 6.8mn-7.4mn t of LNG. In the downstream, the company's Chemicals and Products segment swung to a profit of $1.16bn during the quarter from an impairment-driven loss of $1.83bn in the previous three months, supported by a strong contribution from oil trading operations and higher refining margins driven by greater utilisation of its refineries and global supply disruptions. Shell's refinery throughput increased to 1.43mn b/d in the first quarter from 1.32mn b/d in fourth quarter of last year and 1.41mn b/d in January-March 2023. Shell has maintained its quarterly dividend at $0.344/share. It also said it has completed the $3.5bn programme of share repurchases that it announced at its previous set of results and plans to buy back another $3.5bn of its shares before the company's next quarterly results announcement. The company said it expects its capital spending for the year to be within a $22bn-$25bn range. By Jon Mainwaring Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Australia issues offshore wind feasibility licences


02/05/24
02/05/24

Australia issues offshore wind feasibility licences

Sydney, 2 May (Argus) — The Australian federal government has issued the first feasibility licences for offshore wind projects in the country following a competitive process, for up to 12GW of capacity off the coast of Gippsland in the southern state of Victoria and a potential further 13GW in the next stage. Six projects have received approval to explore the feasibility of offshore wind farms in the Bass Strait off Gippsland's coast, which was the first offshore wind zone declared in Australia at the end of 2022. Successful applicants include Danish investment firm Copenhagen Infrastructure Partners (CIP), Danish utility Orsted, Australian utility AGL Energy, European utilities EDP Renewables and Engie and Japanese utility Jera. The government also intends to grant another six licences, subject to consultation with First Nations groups. The 12 projects could have a potential combined capacity of around 25GW, the government said ( see table ). Projects that prove feasible will be able to apply for commercial licences and move to the construction phase if they secure financing, with the most advanced wind farms expected to start generating power in the early 2030s. CIP secured site exclusivity to develop two projects with a combined 4.4GW through a newly launched platform company Southerly Ten. The projects comprise the 2.2GW Star of the South, which claims to be the most advanced offshore wind project in Australia , along with the early stage 2.2GW Kut-Wut Brataualung. Southerly Ten is also developing the Destiny Wind project in Australia's second declared offshore wind zone off the Hunter region in New South Wales. Orsted was given one licence for a 2.8GW project and might receive another one for a 2GW wind farm. It said it will proceed with site investigations, environmental assessments and supply chain development, with a view to bid in future auctions planned by the Victorian government, which are expected to start in late 2025. Victoria is targeting 2GW of offshore wind capacity by 2032 and 9GW by 2040. "Subject to the above steps and a final investment decision, the projects are expected to be completed in phases from the early 2030s, with the aim to maximise dual site synergies through shared resources and economies of scale," Orsted said. The 2.5GW Gippsland Skies offshore wind project, belongs to a consortium made of Irish renewables firm Mainstream Renewable Power with 35pc, UK-based firm Reventus Power 35pc, AGL Energy 20pc and Australian developer Direct Infrastructure 10pc. The first phase of the project is expected to be operational in 2032, according to the consortium. The list of six projects already granted feasibility licences also include High Sea Wind, a proposed 1.28GW wind farm developed by EDP Renewables' and Engie's 50:50 joint venture Ocean Winds, along with Blue Mackerel North, a 1GW development by Japanese utility Jera Nex's subsidiary Parkwind. Parkwind is also developing another offshore wind project in Australia, with Australian utility Alinta Energy, the 1GW Spinifex in the Southern Ocean off Victoria, which was declared Australia's third wind zone in March. The other projects that might receive licences are being developed by companies such as Spanish utility Iberdrola, Spanish developer Bluefloat Energy, Australian firm Macquarie's wind developer Corio Generation, German utility RWE and a joint venture between Australia's Origin Energy and UK-based developer RES Group. By Juan Weik Australian offshore wind projects with feasibility licences Developer Capacity Licence Orsted Offshore Australia 1 Orsted 2.8 Granted Gippsland Skies Consortium* 2.5 Granted Star of the South Southerly Ten 2.2 Offered Kut-Wut Brataualung Southerly Ten 2.2 Granted High Sea Wind Ocean Winds 1.3 Granted Blue Mackerel North Parkwind 1.0 Granted Aurora Green Iberdrola 3.0 Under consultation Great Eastern Offshore Wind Corio Generation 2.5 Under consultation Gippsland Dawn Bluefloat Energy 2.1 Under consultation Orsted Offshore Australia 2 Orsted 2.0 Under consultation Navigator North Origin Energy, RES 1.5 Under consultation Kent Offshore Wind RWE N/A Under consultation Source: federal government, companies *Mainstream Renewable Power, Reventus Power, AGL, Direct Infrastructure Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

US Fed signals rates likely to stay high for longer


01/05/24
01/05/24

US Fed signals rates likely to stay high for longer

Houston, 1 May (Argus) — Federal Reserve policymakers signaled they are likely to hold rates higher for longer until they are confident inflation is slowing "sustainably" towards the 2pc target. The Federal Open Market Committee (FOMC) held the federal funds target rate unchanged at a 23-year high of 5.25-5.5pc, for the sixth consecutive meeting. This followed 11 rate increases from March 2022 through July 2023 that amounted to the most aggressive hiking campaign in four decades. "We don't think it would be appropriate to dial back our restrictive policy stance until we've gained greater confidence that inflation is moving down sustainably," Fed chair Jerome Powell told a press conference after the meeting. "It appears it'll take longer to reach the point of confidence that rate cuts will be in scope." In a statement the FOMC cited a lack of further progress towards the committee's 2pc inflation objective in recent months as part of the decision to hold the rate steady. Despite this, the FOMC said the risks to achieving its employment and inflation goals "have moved toward better balance over the past year," shifting prior language that said the goals "are moving into better balance." The decision to keep rates steady was widely expected. CME's FedWatch tool, which tracks fed funds futures trading, had assigned a 99pc probability to the Fed holding rates steady today while giving 58pc odds of rate declines beginning at the 7 November meeting. In March, Fed policymakers had signaled they believed three quarter points cuts were likely this year. Inflation has ticked up lately after falling from four-decade highs in mid-2022. The consumer price index inched back up to an annual 3.5pc in March after reaching a recent low of 3pc in June 2023. The employment cost index edged up in the first quarter to the highest in a year. At the same time, job growth, wages and demand have remained resilient. The Fed also said it would begin slowing the pace of reducing its balance sheet of Treasuries and other notes in June, partly to avoid stress in money markets. By Bob Willis Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

FERC OK’s Virginia Transco gasline expansion


01/05/24
01/05/24

FERC OK’s Virginia Transco gasline expansion

New York, 1 May (Argus) — The US Federal Energy Regulatory Commission (FERC) today gave Williams the green light to expand natural gas capacity to Virginia by 101mn cf/d (2.9mn m3/d) on its Transco pipeline. The project, called the Commonwealth Energy Connector, involves the construction of 6.3 miles of new pipeline within Transco's existing right-of-way in southeast Virginia, near the border with North Carolina. The project also includes adding horsepower at compressor station 168, west of the new pipeline segment. Williams plans to begin construction this winter and put the project into service by the end of 2025. Environmental advocacy group Sierra Club opposed the project, arguing FERC failed to assess its potential greenhouse gas emissions, rendering its National Environmental Policy Act analysis moot. FERC disagreed, conceding that although the project's final Environmental Impact Statement demonstrated it would contribute to greenhouse gas emissions, the effects of those emissions on the environment could not be measured because FERC lacks the methodology to do so. The US south-Atlantic gas market has become more volatile in recent years as gas and power demand have soared, outpacing pipeline capacity expansions in the region. The combined gas consumption of Virginia and North and South Carolina in 2022 averaged 4.7 Bcf/d, up by 69pc from a decade earlier, US Energy Information Administration data show. Regional gas and power consumption is widely expected to continue climbing through the end of the decade on a massive build-out of data centers , especially in Virginia. By Julian Hast Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

US gas industry pins hopes on AI power demand


01/05/24
01/05/24

US gas industry pins hopes on AI power demand

New York, 1 May (Argus) — US natural gas producers and pipelines have pivoted almost in unison this year to talking up what they see as one of the strongest bullish cases for gas this decade: surging electricity demand from yet-to-be-built data centers to power artificial intelligence software. EQT, the largest US gas producer by volume, in an investor presentation last week called growing data center demand the "cornerstone" to the "natural gas bull case." Combining its own research with data from the US Energy Information Administration, the gas giant forecast an increase in gas demand of 10 Bcf/d (283mn m3/d) by 2030 to generate electricity, mostly to run data centers. Its more aggressive data center build-out scenario envisions a whopping 18 Bcf/d increase in gas demand through 2030. Total US gas production is currently about 100 Bcf/d. Kinder Morgan, one of the largest US gas pipeline operators, this month forecast 20pc of US power being gobbled up by data centers in 2030, up from a 2.5pc share in 2022. Cobbling together projections from several consultancies and financial advisories, the company said the electricity needed to run artificial intelligence software alone will comprise 15pc of US power demand by 2030. If just 40pc of that demand is met by gas, that would represent an increase in gas demand of 7-10 Bcf/d, it said. This is roughly in line with the high end of US bank Tudor Pickering Holt's forecast for gas demand to power data centers through 2030 (1.3-8.5 Bcf/d) and well above Goldman Sachs' and consultancy Enverus' projections of 3.3 Bcf/d and 2 Bcf/d, respectively. New tech, old problems Separating the wide ranges of these projections is the highly speculative nature of forecasting demand years into the future for competing energy sources to power next-generation technology. But the major upside and downside risks, analysts say, concern the more humdrum challenges of permitting and building out energy infrastructure. Goldman Sachs expects 28GW, or 60pc, of the generation capacity needed to power new data centers through 2030 will come from natural gas — 9GW from combined cycle gas turbines and 19GW from gas peaker plants. But with an average lag of four years from the time a gas transmission project is announced to the time it enters service, to say nothing of the high probability of litigation being brought by environmentalists and landowners, construction and permitting timelines are "the most top of mind constraint for natural gas," the bank said. Indeed, litigation and opposition from state regulators have ultimately led developers to call off several interstate pipeline projects in the eastern US in recent years. The exception to the rule, Equitrans' 2 Bcf/d Mountain Valley Pipeline is moving forward only because congressional action allowed it to bypass federal permitting hurdles. This is a particular problem for the gas industry's hopes of exploiting the data center boom, as a large share of future data centers are slated to be built in the southeast US, far from the major US gas fields. New data centers representing 2 Bcf/d of gas demand in Georgia probably requires a new pipeline into the southeast, FactSet senior energy analyst Connor McLean said. Southeast premium A significant data-center buildout in the southeast without new pipelines could put upward pressure on regional gas prices, McLean said. This could exacerbate the effects of what has become perhaps the most prominent bullish case for US gas: a massive build-out of LNG export terminals along the US Gulf coast. With new export terminals pulling increasing volumes of gas south along the Transcontinental gas pipeline to super-chill and ship overseas in the coming years, the build-out in data centers will likely produce "an even bigger deficit in that southeast (gas) market," EQT chief financial officer Jeremy Knop told investors last week. "We think that market really, in time, becomes the most premium market in the country," he said. By Julian Hast Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more