Crude rally rooted in geopolitics: Opec+ delegates

  • : Crude oil
  • 22/01/25

The recent rally in oil prices has been stoked by geopolitical risks and fuel switching, rather than demand-side improvements alone, some Opec+ delegates told Argus. This shift in focus away from demand could suggest that the coalition is leaning towards another monthly increase of just 400,000 b/d in crude quotas when it next meets on 2 February, after it failed to achieve its output target last month.

Some Opec+ delegates suggested that the current price surge has been led by geopolitics. Four incidents have rattled some of the group's largest producers in January alone, including protests in Kazakhstan and a 24-hour outage at the Iraq-Ceyhan pipeline. Abu Dhabi intercepted a missile in an attack claimed by the Houthis yesterday, after a similar event on 17 January killed three people and caused a fire at oil tanks in the UAE. Although the incidents did not cause any significant output losses, they threatened some of the few Opec+ producers with spare production capacity.

As Ice Brent futures with March delivery are nearing $88/bl today, questions are being raised over a prospective Opec+ response to curtail prices. The group has repeatedly taken the path of least resistance through 400,000 b/d monthly target increases to unwind its outstanding cuts by the end of this year.

The IEA last week signalled that Opec+ efforts to bring back 4.4mn b/d of crude output this year could tighten the group's spare capacity — mainly in Saudi Arabia and the UAE — to 2.6mn b/d in the second half of 2022.

Meanwhile, de facto non-Opec leader Russia — which is gradually nearing its 10.23mn b/d limit, as estimated by the IEA — only increased flows by 10,000 b/d in December, even though the country gained an extra 100,000 b/d in its quota volume. Output recovery can prove difficult after halting a well, even if quotas allow increases, said Pavel Zavalny, chairman of the energy committee in Russia's lower parliamentary house the Duma. Potential US and EU sanctions in the event of a Russian invasion of Ukraine could also weigh on the country's supply.

Argus estimated that Opec+ deal participants fell 650,000 b/d short of their collective December target, as a result of infrastructural issues, underinvestment and sabotage. But at the moment, most Opec+ countries would probably reject a mechanism that allowed other coalition members to raise their output and make up for the shortfalls, two delegates said. These objections would likely simmer down as the deal progresses and more countries in the group begin exhausting their capacity, one of the two sources added.

Some delegates pointed to the demand outlook being destabilised recently by fears that the Covid-19 Omicron variant could trigger a new wave of lockdowns. But the IEA recently raised its global oil demand estimates by 200,000 b/d for 2021 and 2022 — resulting in growth of 5.5mn b/d and 3.3mn b/d, respectively — as a result of softer-than-expected Covid restrictions. US bank Goldman Sachs and UK lender Barclays have raised their oil price forecasts for this year, both citing a lower-than-expected Omicron effect to date.

One Opec+ delegate suggested that some of this demand growth could be short-lived, warning that consumption could be buoyed by fuel switching, as was the case late last year in response to shortages in gas and other energy markets.

Demand growth could be partly met by rising production from those Opec members exempted from the output restraint deal. Libyan output recovered to 1.2mn b/d by 17 January, after the restart of four fields in the west of the country. Venezuelan production rose to a 22-month high of 750,000 b/d in December, thanks to higher imports of Iranian condensate and the use of domestic refinery products to dilute extra-heavy crude supply. Iranian production has largely plateaued near 2.46mn-2.47mn b/d in recent months, but remains at highs last seen in April 2019.

Key consumers are also attempting to make additional supply available through a US-led, six-nation co-ordinated draw from strategic petroleum reserves, although only Washington has so far released crude as part of the initiative. The US, India and Japan all urged Opec+ to consider accelerating its production increases in the fourth quarter last year.


Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

24/06/24

US Supreme Court to weigh Utah railroad permit

US Supreme Court to weigh Utah railroad permit

Washington, 24 June (Argus) — The US Supreme Court will consider reviving a Utah shortline project permit that federal rail regulators had approved but that an appeals court found lacked sufficient environmental review. The Surface Transportation Board (STB) approved construction of the Uinta Basin Railway in December 2021. Opponents said STB failed to meet the requirements of the National Environmental Policy Act and took STB to court. The US Court of Appeals for the District of Columbia agreed with the opponents and overturned the STB decision in August 2023. The US Supreme Court said today it will hear the case. The proposed 88-mile railroad would originate at two locations in the Uinta Basin near South Myton Bench, Utah, and Leland Bench, Utah, and connect to western Class I railroad Union Pacific near Kyune, Utah. The project originally was expected to transport about 80,000 b/d of waxy crude as well as other cargo, but demand for waxy crude has picked up, Seven County Infrastructure Coalition executive director Keith Heaton said. The line also would provide a new transportation option for the region. Local mining and manufacturing businesses have to rely on trucks to ship out of the basin. The type of review envisioned by the appeals court would be unable to encompass the potential environmental impacts from everything that would be shipped by rail, Heaton said. The government must avoid regulatory overreach that "could put into jeopardy projects that might be necessary in helping to strengthen our nation's supply chain", National Industrial Transportation League executive director Nancy O'Liddy said. Wendy Park, a senior attorney for the Center for Biological Diversity, called the lower court's ruling on "this destructive project" legally sound. Development of the project is on hold pending a decision in the litigation. By Abby Caplan Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Trinidad considers offers for shut oil refinery


24/06/24
24/06/24

Trinidad considers offers for shut oil refinery

Kingston, 24 June (Argus) — Trinidad and Tobago is again seeking an operator for the mothballed state-owned 165,000 b/d Guaracara refinery, and will decide by the end of August on several offers for the facility, prime minister Keith Rowley said on Sunday. The government has received eight expressions of interest from domestic and foreign companies to purchase or lease the refinery at Pointe-a-Pierre on the southwest coast that was closed six years ago, government officials told Argus . Rowley did not name the potential operators. But Indian steel producer Jindal Steel and Power "is interested in the potential of the refinery," Rowley's office said last week after he met in Port of Spain with the company's chairman Naveen Jindal. Trinidad shut the refinery in 2018 after a steady decline in crude production forced increases in imported feedstock, sending up refining costs that the government said were "unsustainable." A new owner would likely face similar challenges in obtaining feedstock as the country's crude production has moved from 144,400 b/d in 2005 to average 49,880 b/d in January-March of this year. A restart of the refinery "will be feasible only if there are arrangements for access to competitively priced imported crude that will allow profitable operating margins," a government official told Argus today. The government is making "very good progress" in efforts to offload the refinery, energy minister Stuart Young said on 21 June. But the company that would take over the plant "would have to be able to address several issues including asset management and the financial capability to operate the refinery," Young said. The government has failed since 2018 to reach an agreement with domestic and foreign interests for reopening the refinery. It renewed efforts to offload the facility following the late 2020 collapse of a sale agreement with area labour union-owned company PET that made a $700mn offer, outbidding US private equity firm Beowulf Energy and German refiner and trader Klesch. The government and California-based electrical contractor Quanten failed to reach an agreement in December 2022 for the takeover of the refinery. Growing oil producer Guyana rejected a proposal from Trinidad in February that it should supply crude to allow the Guaracara plant to be reopened. By Canute James Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

MVP start-up shows permitting troubles in US


24/06/24
24/06/24

MVP start-up shows permitting troubles in US

Washington, 24 June (Argus) — The start-up of the Mountain Valley Pipeline (MVP) after a delay of over five years highlights the difficulty the US gas industry faces in building greenfield pipelines under current permitting rules — which are unlikely to change any time soon. The 500km natural gas pipeline began commercial operations on 14 June, at a $7.85bn price tag that was more than double the cost expected when the project was first proposed in 2015. The 2bn ft³/d (20bn m³/yr) pipeline will move shale gas from a mountainous region in West Virginia to demand centres in Virginia, with the possibility for future expansions. MVP is expected to run at just 35-40pc of its nameplate capacity until downstream bottlenecks are removed, according to analyst groups RBN Energy and East Daley Analytics. The pipeline offers the promise of eventually easing price pressure in markets in southeastern US and increasing Appalachian gas output that would otherwise remain constrained. The pipeline — soon to change ownership once US independent EQT closes its $5.5bn all-stock acquisition of operator Equitrans Midstream — is the sole survivor of a round of eastern US pipeline cancellations in 2020-21 caused by permitting issues. MVP was also delayed by permitting lawsuits that forced construction crews to repeatedly halt work, adding billions of dollars to project costs as inflation increased the price of both labour and materials. Construction on the project resumed last year only after extraordinary intervention from the US Congress, which approved all remaining pipeline permits as part of an unrelated law that raised the limit on federal debt. The permitting obstacles for pipelines in the eastern US show no signs of fading, despite smaller changes to speed permitting negotiated through legislation last year. Retiring US senator Joe Manchin, a Democrat from West Virginia, is circulating a comprehensive permitting package he says would fast-track the approval process for pipelines and renewable energy projects. Gas groups say any meaningful permitting bill will have to revise the judicial process and limit the ability of states such as New York to continue using water permits to veto new pipelines. In exchange, renewable energy projects could follow a faster permitting schedule for electricity transmission. But that is a deal many progressive Democrats are reluctant to take, particularly as they face the prospect that former president Donald Trump will win in US presidential elections in November. Far-right Republicans are hesitant to give President Joe Biden a permitting win when they believe they can get a better deal if Trump is elected. But without legislative changes industry officials expect permitting delays to continue whoever is in the White House. "This is not a left or right thing," EQT chief executive Toby Rice says. Sticky red tape Trump's campaign says if he is elected he will speed up approval of gas pipelines serving the Appalachian basin by removing "all red tape". But his regulatory changes when in office failed to make a material difference in permitting timelines, and he repeatedly failed to broker a legislative deal to hasten permitting. Gas industry officials say they want to expedite permitting regardless of the election results, and believe momentum could occur when voters start feeling the effects of delays. "The motivation for pipeline reform I think will increase when the American consumers believe that their energy needs are impacted by the lack of infrastructure," Iowa-based Berkshire Hathaway Energy's gas transmission president, Paul Ruppert, says. The difficulty and time required to permit large greenfield pipelines in the eastern US has led developers to focus on adding capacity to existing pipelines or pursuing shorter expansions instead. By Chris Knight Mountain Valley and its peers Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Nigeria adds more oil blocks to 2024 licensing round


24/06/21
24/06/21

Nigeria adds more oil blocks to 2024 licensing round

Lagos, 21 June (Argus) — Nigeria's upstream regulator NUPRC has added 17 oil blocks to its 2024 licensing round and removed five, leaving the total on offer at 24, double the original number. The 17 additions are all deepwater blocks and have been added as a result of new data acquired. "We had indicated that the total number of blocks we are putting on offer is 12. Actually, our intention was to do more but we were constrained by availability of data," NUPRC chief executive Gbenga Komolafe said. Newly acquired data became available between 7 May and 11 June, leading to the round's offer being expanded, Komolafe said. Five blocks on the original list of 12 — PPL 3008, 3009, 267, 268 and PML 51 — have been withdrawn because of "ongoing litigation", according to NUPRC. The regulator did not elaborate on the litigation. It previously said that PPL 3008 and 3009 were formerly OPL 321 and 323, respectively, with the name change reflecting compliance with the provisions of petroleum industry legislation that came into effect in 2021. The blocks are located in the western Niger delta, close to the 44,000 b/d Abo field floating production, storage and offloading (FPSO) facility operated by Italy's Eni. Nigerian upstream operator Oando, which is in the process of acquiring one of Eni's three Nigerian subsidiaries for an undisclosed amount, has a 30pc working interest in OPLs 321 and 323 through its subsidiary Equator Energy. According to Oando, South Korea's KNOC is operator of a joint exploration work programme for the two blocks, which were awarded in Nigeria's 2005 licensing round before becoming the subject of litigation involving the Nigerian government, the operator and Oando's subsidiary. Meanwhile, PML 51, PPL 267 and PPL 268 are new blocks carved out from the former OML 122, NUPRC said. The shallow water OML 122 block, east of the Shell-operated Bonga field, has long been the subject of litigation and is listed on the website of local upstream firm Peak Petroleum as its sole asset. An industry source told Argus that the withdrawn oil blocks were included in the 2024 licensing round after the regulator enforced forfeiture rules against the companies previously linked to them. But legal challenges are not surprising, the source added. At the launch of its 2024–26 regulatory action plan in January, NUPRC said enforcement of "drill or drop provisions" in the 2021 legislation is one of its main commitments. Nigeria plans to conclude the 2024 licensing round with ministerial consent and contracting in January 2025. NUPRC has pushed back the deadline for submissions of pre-qualification documents from 25 June this year to 5 July and the start of data access and evaluation from 4 July to 8 July. By Adebiyi Olusolape Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Canadian greenwashing bill passes


24/06/20
24/06/20

Canadian greenwashing bill passes

Calgary, 20 June (Argus) — A proponent of a major carbon capture and storage (CCS) project in Canada removed most information from its website this week after a federal bill targeting "greenwashing" successfully made its way through Parliament. The Pathways Alliance, a group of six oil sands producers, removed material from its website in response to Bill C-59 after it passed its third and final reading in Canada's senate on 19 June, citing "uncertainty on how the new law will be interpreted and applied." Parts of the soon-to-be law will "create significant uncertainty for Canadian companies," according to a statement by Pathways which is the proponent of a massive C$16.5bn ($12bn) CCS project in Alberta's oil sands region. The Pathways companies proposed using the project and a host of other technologies to cut CO2 emissions by 10mn-22mn t/yr by 2030. Project details and projections are now gone from the Pathways website, social media and other public communications as the pending law will require companies to show proof when making representations about protecting, restoring or mitigating environmental, social and ecological causes or effects of climate change. Any claim "that is not based on adequate and proper substantiation in accordance with internationally recognized methodology" could result in penalties under the pending law. Offenders may face a maximum penalty of C$10mn for the first offense while subsequent offenses would be as much as C$15mn, or "triple the value of the benefit derived from the anti-competitive practice." Invite to 'resource-draining complaints' The bill does not single out oil and gas companies, but the industry includes the country's largest emitters and has long been in the cross-hairs of the liberal government. Alberta's premier Danielle Smith says the pending bill will have the unintended effect by stifling "many billions in investments in emissions technologies — the very technologies the world needs." Construction of the Pathways project is expected to begin as early as the fourth quarter 2025 with operations starting in 2029 or 2030. The main CO2 transportation pipeline will be 24-36-inches in diameter and stretch about 400km (249 miles). It will initially tap into 13 oil sands facilities from north of Fort McMurray to the Cold Lake region, where the CO2 will be stored underground. Pathways includes Canadian Natural Resources, Cenovus, Suncor, Imperial Oil, ConocoPhillips Canada and MEG Energy, which account for about 95pc of the province's roughly 3.3mn b/d of oil sands production. Some producers took down content as did industry lobby group the Canadian Association of Petroleum Producers (CAPP), which highlighted the "significant" risk the legislation creates. "Buried deep into an omnibus bill and added at a late stage of committee review, these amendments have been put forward without consultation, clarity on guidelines, or the standards that must be met to achieve compliance," said CAPP president Lisa Baiton on Thursday. This "opens the floodgates for frivolous, resource-draining complaints." By Brett Holmes Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more