Viewpoint: New fuels coming for European marine use

  • Market: Oil products
  • 28/12/18

New fuels compatible with the International Maritime Organisation's (IMO) 0.5pc marine fuel sulphur cap should become more prevalent in the first half of 2019, with shipowners eager to gain operational experience.

The IMO regulation will cap sulphur content in bunker fuel to 0.5pc starting on 1 January 2020, down from 3.5pc today. Shipowners are still seeking insurances regarding fuel compatibility between different 0.5pc blends, and with marine gasoil (MGO).

The efficiency, stability and safety of the fuels remain a concern, although refiners — including Shell, Total and Italy's Eni — have started to offer 0.5pc fuels for testing. Total and container liner CMA CGM have struck a deal for the supply of marine fuels including 0.5pc grade, and tests have begun.

Some shipowners are reluctant to pay the premium to high-sulphur fuel oil (HSFO) asked by suppliers before the 2020 deadline. Some also fear that testing new fuels could damage vessels. And the fact that owners who have already tried some of the fuels cannot report the results because of non-disclosure agreements keeps the market in a fog. This is likely to mean that smaller owners will use MGO until the new fuels' specifications become clearer, although the middle distillate could carry a $100-150/t premium over 0.5pc fuels in 2020.

While shipowners are largely in the dark about availability and specifications of 0.5pc blends, major bunker suppliers still do not know what refineries are going to produce, making it difficult to plan storage space. A wider range of new 0.5pc fuels should become available in the next six months, but this leaves little time before the sulphur cap comes into force.

Scrubber-ready fleets are the most prepared for 2020, as HSFO is a familiar bunker fuel. But owners will also need assurances of supply.

Scrubbers remove sulphur from exhaust fumes and allow ships to continue burning HSFO. Ships with scrubbers are likely to stick to routes between major ports, where high-sulphur fuels will be readily available.

A range of marine fuel products — high-sulphur 380cst, high-sulphur 180cst, MGO and 0.5pc blends — will be available at the world's biggest bunkering hubs, including Rotterdam, Fujairah and Singapore. It is not clear what the availability will be at smaller ports.

Ships with scrubbers can take more expensive distillate fuels in emergencies, but repeated use of these grades will affect payback time for the technology. Large ships, with the highest consumption levels, need payback time of 12-18 months to justify the investment.

Scrubber demand has picked up drastically over the past six months as buyers rushed to the market ahead of the 2020 deadline. The capacity to manufacture and install the systems is limited in Europe — most manufacturers have filled their order books for pre-2020 fitting — but facilities in the Asia-Pacific region are likely to grow and provide the equipment at a lower cost.

Demand for scrubbers after 2020 is limited because the price differential between high-sulphur and 0.5pc fuels is likely to narrow, meaning a longer payback time on the investment.

And the outlook for scrubber uptake has suffered a blow recently. Singapore, the world's largest bunkering port, said it will ban ships that have installed open-loop scrubbers from discharging wash water in the port from 1 January 2020. About 70-80pc of scrubber demand is for open-loop systems. Open-loop scrubbers discharge waste sulphur directly into the sea.

The Singapore ban adds to similar moves in Germany, Belgium, Ireland and many US ports. The coming six months may see further port authorities follow suit. Tighter legislation is likely, especially in Emission Control Areas (ECAs). Further regulatory limits on the use of scrubbers may arise, but the IMO is unlikely to change regulations until the sulphur cap has been in place for a significant amount of time. Scrubbers could be fitted on around 4-5pc of the global fleet by 2020.

Most ships fitting the technology will be taking on contracts with marine fuel suppliers in order to secure supply, as availability of HSFO will decrease.


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News

North Germany sees May holiday gasoline surge


06/05/24
News
06/05/24

North Germany sees May holiday gasoline surge

Hamburg, 6 May (Argus) — Driving activity in Germany increased around the public holiday on 1 May, leading to a rise in regional demand for fuels, particularly gasoline, in the past week. Oversupply of diesel is also pressuring premiums in Europe. Daily volumes of diesel and E5 gasoline reported to Argus this week were higher than the average for the current year. Demand for gasoline in the North region notably increased, with reported volumes in the past week reaching the highest daily average in 2024. The filling station sector is almost entirely responsible for the increased demand, market participants said. Many end-users took Monday and Tuesday off as additional holidays, leading up to 1 May. This resulted in a temporary increase in travel activity. In anticipation of this, filling station operators stocked up on fuel. But compared with previous years, overall demand for diesel in Germany remains weak. Coupled with plenty supply of diesel on the international market, this has led to premiums of cif Hamburg in April reaching their lowest level since July 2023. In the face of oversupply the difference between cif Hamburg diesel and cif ARA assessment fell further as well over the past week. The volume of diesel imported to northern Germany increased by 18pc in April compared with March, reaching around 71,000 b/d, data from Vortexa show. The low premiums of the diesel cif assessments, along with the ICE Gasoil Future's contango — which has encouraged the storage of product in tanks since mid-April — have particularly boosted import demand. By Johannes Guhlke Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Panama's new president faces copper, canal issues


06/05/24
News
06/05/24

Panama's new president faces copper, canal issues

Kingston, 6 May (Argus) — Stand-in candidate Jose Raul Mulino will take office on 1 July as president of Panama with a challenge to decide on the future of one of the biggest copper mines in the Americas. The 64 year-old lawyer won yesterday's presidential election in the central American country, promising a "pro-investment and pro-business" policy. He won with 35pc of the vote and an about 10 percentage point lead over his next closest rival, Ricardo Lombana. But he has delivered no comment on the future on the shuttered Canadian-owned copper facility that is one pillar of the country's economy. His government will use public works projects and incentives for foreign investors to restore economic growth, Molino said, without giving details. Panama also faces a crippling drought that has lowered water levels and reduced transit through the economically important Panama Canal. First Quantum intends to meet the new government to discuss reopening the mine, the company's chairman Robert Harding said in March. "Whatever government is elected, we will work with it," Harding said. "We would like to see this mine reopen." Panama closed the $10bn Cobre Panama mine after a supreme court ruling in November that First Quantum's contract was unconstitutional. The mine accounted for 5pc of the country's economy and 1.5pc of global copper output, according to the government. The shutdown will limit the country's economic growth to 2.5pc this year against 7.5pc in 2023, the IMF has forecast. The supreme court's order to close the mine followed weeks of protests over the terms given to First Quantum in October. Protests wracked the country as opposition parties, trade unions, environmental lobbies and non-governmental organizations objected to the terms. "Although the mine's owners would be happy to negotiate a reopening with the new administration, this is a very hot and controversial matter for the new government," a senior official of the outgoing government of President Laurentino Cortizo told Argus today. "Any suggestion of negotiating a reopening would again bring people on the streets." Mulino ran with former president Ricardo Martinelli until the courts disqualified Martinelli because of a money laundering conviction. Martinelli had proposed that Panama renegotiate the contract with First Quantum to secure higher royalties and a stake. "Mulino is a mentee of Martinelli, but I doubt he would stoke public anger by seeking to reopen the mine," the official said. Cobre Panama produced 331,000 t in 2023, 5pc less than 2022 output, First Quantum said. By Canute James Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Mexico's long refining quest tilts in its favour


06/05/24
News
06/05/24

Mexico's long refining quest tilts in its favour

Mexico City, 6 May (Argus) — Mexico's six-year campaign to boost refinery output and cut its dependence on US oil imports is starting to pay off, but time will tell if it can sustain the effort. State-owned Pemex's six domestic refineries processed more than 1mn b/d of crude in March for the first time in almost eight years, boosting its gasoline and diesel output by 32pc and cutting its imports by 25pc from a year earlier. Combined with Pemex's still declining crude production, this has pulled approximately 500,000 b/d of Mexican crude exports — mostly medium and heavy sour grades — from the market compared with a 2023 peak of 1.2mn b/d in June — equivalent to the loss of about 175,000 b/d on average this year compared with 2023. The government said earlier this year that it was not planning "significant" export cuts after cancelling some term contracts. But the drop in shipments combined with the eventual start of its long-delayed 340,000 b/d Olmeca refinery, possibly in 2025, has the potential to shift global flows. At least two independent US Gulf coast refiners are sceptical of major shifts. Road fuel demand is expected to exceed capacity additions in the coming years, Marathon Petroleum chief executive Michael Hennigan said recently. Valero, which is opening a marine storage terminal in Mexico, where about 250 retail outlets carry its brand, expects demand from Mexico to remain strong and grow, chief operating officer Gary Simmons said in its latest earnings call. The impact of Mexico's shift to greater self-sufficiency will depend heavily on its ability to sustain its long-promised refinery renaissance. Mexico's crude exports have already picked up in April from March, to roughly 660,000 b/d based on ship tracking data, although still about 125,000 b/d lower than a year earlier. Energy independence Pemex's refining rates started to fall in 2014 after the previous administration chose to rely less on domestic production and focus more on opening the energy market to outside investment. President Andres Manuel Lopez Obrador vowed to make Pemex great again and build a big refinery to reach "energy independence" when he took office in late 2018. Lopez Obrador poured at least $3.7bn into maintenance alone at Pemex's ageing refineries in 2019-23, excluding major projects including uncompleted ones to add cokers at two refineries that will cost $6bn-8bn and a spiralling $16bn-20bn for the Olmeca plant. It bought out Shell's share in the Deer Park refinery in Texas , taking full control of the plant in 2022. With presidential elections set for June, it was time to show results. But Pemex has a long history of high accident rates , making refinery operations unreliable. The next administration may have to sustain some of this spending and tackle Pemex's $101.5bn debt at a time of calls for structural reform. In addition, the 330,000 b/d Salina Cruz and 315,000 b/d Tula refineries — Mexico's largest — have long struggled with elevated high-sulphur fuel oil (HSFO) production that takes up valuable storage space and makes it hard to run both plants at high rates simultaneously. Record-high exports of HSFO in March helped and Pemex is building coking units at both refineries to solve this, but they are unlikely to both start until early 2025. Attention is on whether and when the Olmeca refinery will affect Mexican demand and offer balance more permanently. Pemex said it will start producing diesel in late May, but also does not expect more than 9,000 b/d of output of all fuels this year . The refinery has missed multiple deadlines, the latest in April. Olmeca's crude unit — the first processing unit — faces "major issues", a source familiar with Pemex refinery operations says. But others say secondary processing units are ready. Pemex refinery operating rates % Domestic refineries Mar 24 Feb 24 Tula 78 80 Salina Cruz 72 40 Madero 69 60 Salamanca 62 60 Cadereyta 58 60 Minatitlan 53 50 Pemex Pemex exports, imports ’000 b/d Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Indonesia’s PIS seeks MR vessels to ship oil products


06/05/24
News
06/05/24

Indonesia’s PIS seeks MR vessels to ship oil products

Singapore, 6 May (Argus) — Indonesia's Pertamina International Shipping (PIS) is seeking two Medium Range (MR) vessels to ship clean oil products to Sulawesi and Central Java provinces for early-May loading. PIS — a wholly-owned subsidiary of Indonesian state-owned refiner Pertamina — has issued two spot tenders. The shipments can have a maximum unavoidable transportation loss of up to 0.07pc, according to the tenders. A 200,000 bl shipment will load either from Singapore or Malaysia's Tanjung Bin, Tanjung Langsat or Pengerang during 10-11 May, before heading to two discharge ports in Indonesia's Baubau and Semarang. The tender closed at 10am Jakarta time (3am GMT) on 6 May. The firm issued another tender that closed at 2pm Jakarta time on 3 May. The 300,000 bl shipment will load from the same potential ports during 8-9 May, before heading to Indonesia's Semarang. PIS booked the 2021-built, 34,752 deadweight tonne Bowmore at $800,000 for a 200,000 bl shipment from Singapore to two discharge ports in Indonesia's Bau Bau and Wayame with loading from 17 April, through a tender that closed on 9 April . By Sean Zhuang Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more