AES speeds up Chile coal power retirements

  • Market: Coal, Electricity, Hydrogen
  • 06/07/21

US utility AES is accelerating the shutdown of 1,097MW of coal-fired power generating units in Chile, in line with the greening of its corporate strategy and the country's decarbonization plan.

Ventanas units 3 and 4 in the central coastal city of Puchuncavi and Angamos 1 and 2 in the northern port city of Mejillones will be available for decommissioning on 1 January 2025, AES Andes said today.

The four units represent 20pc of Chile's coal-fired generating capacity.

AES Andes has already requested the retirement of Ventanas 1 and 2, which have a combined capacity of 322MW.

The shutdowns stem from a 2019 voluntary decarbonization agreement between Chile's largest generators and the government of President Sebastian Piñera.

Since then, the decommissioning has been accelerated to take more of the capacity off line sooner, in parallel with an aggressive national strategy to develop green hydrogen.

In 2018, coal-fired capacity in Chile's national grid (SEN) totaled 5,526MW across 28 units. In the 2026-40 period, only 10 units totaling 1,965MW will now remain in service, the president's office said today.

Most of Chile's coal-based power stations date back to the years following Argentina's curtailment of pipeline natural gas exports in 2004, exposing the country to potential blackouts and leading to the installation of two regasification terminals as well. Recent coal imports originated in Colombia, Australia, Canada, Russia and the US.

Demand picking up

The SEN currently has 25,792MW of installed capacity, including 18pc coal from units, 15pc apiece for natural gas and diesel, 14pc solar, 13pc hydroelectric dams, 11pc run-of-river hydro, 10pc wind and 2pc each for biomass and mini-hydro.

According to National Energy Commission (CNE) data, SEN generation in May totaled 6,877GWh, up by 7.4pc from a year earlier when the Covid-19 pandemic was in full swing.

Coal power units accounted for 39pc of the May generation, followed by gas with 23pc, hydro 15pc and 7pc wind. The remainder came from biomass, diesel and mini-hydro units.

Hydro generation normally picks up in June with the onset of winter rains.


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
22/04/24

Colombia's electricity woes add to unrest against Petro

Colombia's electricity woes add to unrest against Petro

Bogota, 22 April (Argus) — Colombians took the streets of major cities and towns across the nation on Sunday to protest mainly against health, pension and labor changes, but potential power outages are also creating discontent. Authorities estimated that about 250,000 Colombians marched in widespread protests, sparked by changes in healthcare. Congress in April had rejected President Gustavo Petro's proposals in the sector, and the government the next day seized the two largest private-sector health insurers. Protesting healthcare workers say the government did this to implement changes through a back channel. "Regulatory noise and risk are likely to remain high amid announcements, proposals, and measures [that do not require congressional approval], aimed at changing the game's rules in strategic sectors," brokerage Credicorp Capital said. Colombians also protested being on the verge of electricity rationing like that in neighboring Ecuador as hydroelectric reservoirs remain at record-low levels. Several unions and other associations have long warned the Petro administration to take measures to offset the effects of the El Nino weather phenomenon. Electricity distributors last year called for allowing bills for energy purchased on the spot market to be deferred and for loosening price index rules, among other proposals. The national business council sent at least three letters to the president on the issue. At least nine separate letters calling for preparation to prevent blackouts were sent to the president and ministers. Several actions were only recently implemented . "There are no risk of electricity rationing in Colombia," former energy minister Irene Velez said in 2023. "We do not understand why some people are interested in generating panic." Government weather forecasts also overestimated rainfall expected for March, leading hydroelectric plants to use more water in the reservoirs than they otherwise would have, said director of the thermoelectric generation association (Andeg) Alejandro Castaneda. Reservoir levels stood at 29.5pc today, rising thanks to rains since 19 April, up from 28.75pc on 18 April. Electricity rationing is set to begin when reservoirs drop below 27pc, according to grid operator XM. By Diana Delgado Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Read more
News

Baltimore opens third temporary shipping channel


22/04/24
News
22/04/24

Baltimore opens third temporary shipping channel

New York, 22 April (Argus) — A third temporary shipping channel has opened at the Port of Baltimore to allow more vessel traffic around the collapsed Francis Scott Key Bridge. Located on the northeast side of the main channel, the new passage has a controlling depth of 20-ft, a 300-ft horizontal clearance, and a vertical clearance of 135-ft. When combined with two other temporary channels opened earlier this month the port should be able to handle "... approximately 15 percent of pre-collapse commercial activity," said David O'Connell, the federal on-scene coordinator. The main shipping channel of the Port of Baltimore — a key conduit for US vehicle imports and coal exports — is expected to be reopened by the end of May, the Maryland Port Administration said earlier this month. The bridge collapsed into the water late last month when the 116,851dwt container ship Dali lost power and crashed into one of its support columns. Salvage teams have been working ever since to remove debris from the water and containers from the ship in order to clear the main channel. By Stephen Cunningham Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Australia to launch 6GW renewables tender in May


22/04/24
News
22/04/24

Australia to launch 6GW renewables tender in May

Sydney, 22 April (Argus) — Australia's federal government plans to launch the country's largest ever tender for renewable energy in May, with more than a third of the capacity to be allocated to New South Wales (NSW) state. The first major tender under the federal government's expanded Capacity Investment Scheme (CIS) will offer support for 6GW of renewable generation capacity, with at least 2.2GW of the total set specifically to NSW, the federal and state governments said in a joint statement on 22 April. A market briefing outlining the tender process will be released in early May. A minimum of 300MW will also be exclusively allocated to projects in South Australia (SA), even though that is still subject to a final agreement between the federal and state governments. The remaining capacity will be allocated across the National Electricity Market, which apart from NSW and SA also includes Queensland, Victoria, Tasmania and the Australian Capital Territory. Tenders will run every six months until 2026-27 under the expanded CIS, with up to 15 years of support for a total of 32GW . This will consist of 23GW of renewable capacity like solar, wind and hydro and 9GW of dispatchable capacity such as pumped hydro and grid-scale batteries with at least two hours of dispatch. The inclusion of generation projects in NSW in the first CIS tender will replace the state's scheduled long-term energy service agreements (LTESA) tender under its NSW Roadmap. NSW will proceed though with the LTESA tender for long-duration storage infrastructure in the second quarter of 2024, as well as processes to award access rights for its Central West Orana and South West Renewable Energy Zones. The federal government also said it plans to launch a separate tender in Western Australia in mid-2024 targeting 500MW of dispatchable capacity. By Juan Weik Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Japan's Jera shuts Chiba gas-fired power unit


22/04/24
News
22/04/24

Japan's Jera shuts Chiba gas-fired power unit

Tokyo, 22 April (Argus) — Japan's largest electricity producer by capacity Jera has shut the 360MW No.1-4 combined cycle gas turbine (CCGT) units at its Chiba power complex because of a technical problem. Jera closed on 22 April the CCGT units at the 4.38GW Chiba complex in east Japan's Chiba prefecture, according to a notice by Japan Electric Power Exchange (Jepx). It is unclear when the units will be brought back on line. The unexpected shutdown is likely to have limited impact on Japan's power market as the country has experienced mild weather lately that has capped power consumption. Jera consumed 16.7mn t of LNG in April-December 2023, lower by 4.8pc compared with the same period a year earlier, according to the firm's latest financial results. Japan's total power demand averaged 83GW during 15-21 April, down by 3pc from the previous week, data show from nationwide transmission system operator the Organisation for Cross-regional Co-ordination of Transmission Operators. Japan plans to add 1.1GW of thermal capacity during the week to 28 April, with the addition of 11.5GW outstripping the closure of 10.4GW, according to Argus' survey based on a Jepx notice. The difference incorporates the net increase this week in gas-fired capacity of 2GW and the net drop in coal-fired capacity of 887MW. By Reina Maeda Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Australia's QPM to focus on gas, cut Tech battery spend


22/04/24
News
22/04/24

Australia's QPM to focus on gas, cut Tech battery spend

Sydney, 22 April (Argus) — Australian battery metals refiner Queensland Pacific Metals (QPM) will focus on energy markets via its Moranbah gas project (MGP) and limit further expenditure on its Townsville Energy Chemicals Hub (Tech) project. The firm will switch its prioritisation to its wholly-owned QPM Energy (QPME) business, with QPME's chief executive David Wrench to be appointed as QPM chief executive, the company said on 22 April. MGP's coal mine waste gas output from nearby the coal mining hub of Moranbah in Queensland's Bowen basin will be increased to 35 TJ/d (935,000 m³/d) by late 2024, up from October-December 2023's 28 TJ/d, with QPME to accelerate production and reserves to provide required peaking power for the national electricity market (NEM) via Thai-controlled energy firm Ratch Australia's 242MW Townsville Power Station. QPME aims to drill a further seven wells by the year's end, increase workovers and increase production from third-party supply of waste mine gas from regional coal mines. The company is also seeking to develop a portfolio of plants to supply up to 300MW of gas-fired power to the NEM, while compressed natural gas and micro-LNG facilities will also be developed in Townsville and Moranbah, QPME said. A surge in government support for renewable power generation in order to meet Australia's 2030 emissions target by retiring coal-fired power means more gas-peaking plants will likely be needed in the coming years to support variable generators. But Australia's domestic gas supply is forecast to experience shortfalls this decade, with predictions of a 76 PJ/yr gap in 2028. The Tech project which aims to produce 16,000 t/yr of nickel and 1,750 t/yr of cobalt sulphates from imported laterite ore saw its funding significantly reduced in February because of what QPM described as a "challenging investment environment" resulting from depressed nickel prices. By Tom Major Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more