EU HRC: First 2019 automotive deals done as rollovers

  • Market: Metals
  • 14/11/18

Northwest European steel mills have concluded their first 2019 deals with automotive buyers at a rollover from this year's prices, following protracted negotiations.

One steelmaker finalised a large deal at stable pricing in the last few days, an executive at the firm said, adding that "it is a fairly good result given the development of the market, but it is a margin squeeze".

But mills hope to secure deals for smaller volumes at slightly higher prices to alleviate that squeeze. They argue that automotive contracts with raw material clauses do not account for the steep increase in costs of high-grade iron ore and direct charge materials. The clauses are based solely on headline 62pc Fe iron ore indices, as well as fob Australia coking coal prices. Increased costs for electrodes and refractories, as well as for some alloys, are not also factored into the agreements.

Headline iron ore indices have been rangebound in the last year but premiums for higher grades have soared, primarily as a result of China's Blue Sky environmental protection drive and supply side constraints.

The automotive deals are an important indicator of coil pricing direction, and have been keenly awaited by many participants across the supply chain. Carmakers had initially pushed for large discounts of up to €60/t ($68/t) compared with this year, with mills aiming for €20-30/t rises.

There was still concern over how automotive demand for steel would develop into next year. Auto order intake is broadly stable for January-February 2019 compared with this year, one mill executive said, but he questioned how this could be the case given the marked slowdown in the sector.

"Mills are probably negotiating automotive contracts for next year and trying to keep prices high somehow," one London-based trader said, referring to high offer prices and the perceived inflated level of some indices.

Stockholders still refer to prices being around €550/t ex-works in northern Europe, but this is above what sellers are quoting and likely reflects the fact that those with inventory do not want to see prices slip and their stock depreciate.

The supply chain appears to be well stocked, and service centre margins are compressing as people look to whittle down inventories.

One mill with strong exposure to a certain carmaker still has surplus fourth quarter material to sell, which is weighing on pricing. And Italian material continues to be offered aggressively into northern Europe, at prices substantially below those northwest European sellers are targeting.

The euro remains weak, as Italy's crisis with the EU appears to deepen and its bonds are sold off rapidly. This is making life tougher for traders, but hot-rolled coil (HRC) is still available at €510/t cfr Antwerp from one trader.

Material is available into southern Europe at below €500/t cfr. There were competitive quotes for Brazilian cold-reduced coil at €615/t delivered service centre, compared with €620-630/t ex-works quotes for domestic material.

There is still belief that the US' Section 232 duty on Turkey will be reduced to the original 25pc, explaining Turkish producers' reduced presence in the European market. One Marmara-based steelmaker has offered into the US at $730/st ddp Houston, contingent on the 232 duty falling to 25pc. Increased clarity over this issue could spur some import activity, one trader said.

Argus' northwest European HRC index slipped by €1.75/t to €533.25/t today.

Summary of market activity heard by Argus

  • HRC-EU: A steelmaker estimated tradeable value at €540/t ex-works
  • HRC-EU: An offer for German material at €545/t ex-works
  • HRC-EU: A service centre estimated tradeable value at €550/t ex-works
  • HRC-EU: An offer for imported material at €500/t cif southern European port
  • CRC-EU: A steelmaker estimated tradeable value at €625/t ex-works
  • CRC-EU: Brazilian material offered at €615/t delivered service centre

Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
22/04/24

Hydro invests in metal recycling plant at Hoyanger

Hydro invests in metal recycling plant at Hoyanger

London, 22 April (Argus) — Norwegian aluminium producer Hydro has invested 240mn kroner ($21.8mn) in a new recycling facility alongside its primary aluminium smelter in Hoyanger, Norway. The recycling plant will process 36,000 t/yr of post-consumer aluminium scrap, as Hydro moves towards its 2030 target of reducing its emissions by 30pc compared with 2018 levels. The new facility will process scrap metal from vehicles, building facades, furniture, packaging and other consumer goods, which will be mixed with primary metal made with renewable hydropower at the Hoyanger plant. Among Hydro's low-carbon aluminium products is the Circal brand of aluminium, which is made with 75pc recycled content, and the Reduxa brand, which is made with renewable energy and generates emissions of less than 4kg CO2/kg aluminium produced. They are key to the company's emission reduction targets and ultimately reaching net zero by 2050. "Recycling is the fastest way to zero. With this new facility, we deliver on our strategy to increase recycling capacity in our efforts to decarbonise our own production processes and make products that the world needs for the green transition," the executive vice-president of Hydro's aluminium metal business, Eivind Kallevik, said. By Jethro Wookey Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Read more
News

Baltimore opens third temporary shipping channel


22/04/24
News
22/04/24

Baltimore opens third temporary shipping channel

New York, 22 April (Argus) — A third temporary shipping channel has opened at the Port of Baltimore to allow more vessel traffic around the collapsed Francis Scott Key Bridge. Located on the northeast side of the main channel, the new passage has a controlling depth of 20-ft, a 300-ft horizontal clearance, and a vertical clearance of 135-ft. When combined with two other temporary channels opened earlier this month the port should be able to handle "... approximately 15 percent of pre-collapse commercial activity," said David O'Connell, the federal on-scene coordinator. The main shipping channel of the Port of Baltimore — a key conduit for US vehicle imports and coal exports — is expected to be reopened by the end of May, the Maryland Port Administration said earlier this month. The bridge collapsed into the water late last month when the 116,851dwt container ship Dali lost power and crashed into one of its support columns. Salvage teams have been working ever since to remove debris from the water and containers from the ship in order to clear the main channel. By Stephen Cunningham Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

China's Lopal starts first Indonesian LFP battery plant


22/04/24
News
22/04/24

China's Lopal starts first Indonesian LFP battery plant

Beijing, 22 April (Argus) — Major Chinese lithium iron phosphate (LFP) producer Jiangsu Lopal Tech has launched production at the first phase of its Indonesia-based LFP production plant. The Indonesian plant is the first overseas LFP battery material production project with over 10,000 t/yr capacity that a Chinese company has invested in, Lopal said. Lopal's subsidiary Changzhou Liyuan New Energy Technology started building the first phase of the project in July last year, with a 30,000 t/yr output capacity for LFP battery material. The line started pilot production in March. The plant is located in the Kendal Industrial Park in Indonesia's Central Java province. The whole project has a designed capacity of 120,000 t/yr, with the second phase of 90,000 t/yr likely to start construction in the second half of this year. This project marks a milestone in China's investment in overseas battery feedstock resources, according to market participants. Most Indonesian projects that Chinese firms invest in are for primary materials or intermediates such as lithium salts, graphite, nickel matte, mixed hydroxide precipitate (MHP) and ferro-nickel including nickel pig iron. Lopal has been accelerating its investment in lithium-ion battery material production in the past few years. It is also building a 50,000 t/yr production line for LFP and a 100,000 t/yr plant for iron phosphate in the Shandong Heze Juancheng industrial park, in which another 80,000 t/yr iron phosphate project is located. Changzhou Liyuan on 18 April released its newly-developed 4th generation high compaction LFP cathode material S501, with 2.65g/cm³ of compaction. This has increased the battery's energy density and power load, said the company. LFP has taken up a bigger market share in the power battery market because of its lower manufacturing costs and safer performance. But one of its main disadvantages is shorter driving ranges on electric vehicles because of lower energy density. Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

International Graphite gets Western Australia funding


22/04/24
News
22/04/24

International Graphite gets Western Australia funding

Singapore, 22 April (Argus) — Australia's International Graphite will receive fresh funding of A$6.5mn ($4.2mn) for its graphite project and plans in Western Australia's (WA) Collie from the state government. The Labor party-led government of premier Roger Cook will provide A$4.5mn to support the acceleration of International Graphite's pilot graphite micronising plant in Collie to "full scale", with A$2mn for its battery anode material facility feasibility study, the WA government said on 20 April. International Graphite in February wet commissioned its 200 t/yr graphite micronising plant, having obtained government approval for equipment installation late last year. The facility is a precursor to its planned 4,000 t/yr commercial micronising facility in Collie, which is expected to cost A$12.5mn and could begin construction by mid-2024, the firm said. It plans to build the operations over 18-24 months, the WA government said. The company last year signed an exclusive agreement for a lease related to its Collie graphite battery anode material facility. It is aiming to be the first fully integrated battery anode graphite processing firm in WA. International Graphite owns the Springdale graphite deposit near Hopetoun in WA, the second-largest known graphite deposit in the country. The deposit has a mineral resource estimate of 49.3mn t of 6.5pc total graphitic carbon, according to the firm on 12 September. The Australian federal government last year gave A$4.7mn to International Graphite through its Critical Minerals Development Programme grants. It received the first and second tranche of A$1.7mn and A$1.25mn last year. By Joseph Ho Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Japan’s crude steel output falls on year in March


22/04/24
News
22/04/24

Japan’s crude steel output falls on year in March

Tokyo, 22 April (Argus) — Japan's crude steel production fell on the year in March on the back of lower demand from the automobile sector, marking the first year-on-year decline in four months. The country produced 7.2mn t of crude steel during March, down by 3.9pc from a year earlier, according to preliminary data released by industry group Japan Iron and Steel Federation (JISF) on 22 April. The lower output is partly because of lower steel demand from the automobile sector, especially as fellow Japanese manufacturer Daihatsu suspended part of its operations since December 2023 after it was accused of tampering safety test results. Crude steel demand may not recover in April as Daihatsu will not reopen all its domestic facilities until 7 May . Japan's crude steel output is forecast to fall by 2.2pc from a year earlier to 21.7mn t in April-June, according to a quarterly forecast released on 11 April by the country's trade and industry ministry (Meti). The year-on-year fall is mostly attributed to weaker demand in the construction sector, especially housing, on the back of rising material costs and labour shortages, according to Meti. JISF separately said on 18 April that steel product demand from the non-housing construction sector during the April 2024-March 2025 financial year is forecast to fall from a year earlier. Demand would remain sluggish, a JISF researcher told Argus , despite several planned large construction projects including semi-conductor plants and data centres. Lower demand from other non-housing construction sectors, including office buildings weighed on overall demand, JISF added. The numbers were not disclosed. By Yusuke Maekawa Japanese ferrous output ('000't) Mar '24 Feb '24 Mar '23 m-o-m ± % y-o-y ± % Crude steel production Ordinary steel 5,626.4 5,467.5 5,909.1 2.9 -4.8 Specialty steel 1,570.6 1,521.5 1,576.8 3.2 -0.4 Total crude production 7,197.0 6,989.0 7,485.8 3.0 -3.9 Crude steel production method Basic oxygen furnace 5,144.5 5,123.0 5,529.5 0.4 -7.0 Electric arc furnace 2,052.5 1,866.0 1,956.4 10.0 4.9 Pig iron production 5,038.2 5,010.5 5,361.1 0.6 -6.0 Source: Japan Iron and Steel federation *Preliminary data Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more