South Korea adds to momentum for 2050 carbon neutrality
South Korea is aiming to achieve carbon neutrality by 2050, including replacing coal-fired power generation with renewable alternatives, President Moon Jae-in said today.
The pledge, which builds on goals laid out in the country's "green new deal" earlier this year, adds to momentum in east Asia to reach net-zero emissions by around the middle of this century. The Japanese government this week said it will target net-zero greenhouse gas emissions by 2050, after China last month pledged to become carbon neutral by 2060.
South Korea "will move forward to aim for carbon neutrality by 2050, by actively responding to climate change with the international community", Moon said in parliament. "We will create new markets, new industries and new jobs by replacing coal power with renewable energy."
Seoul plans to create a low-carbon, green industrial complex, Moon said, although he did not give any further details of how the switch to renewable energy will affect thermal fuels. South Korea is a major importer of LNG and coal and one of Asia's biggest oil refining and petrochemical hubs.
South Korea announced plans in July to invest 73.4 trillion won ($64.7bn) in energy initiatives as part of its "New Deal" programme, which is a W160 trillion package of measures to create 1.9mn jobs over the next five years. The plans include expanding fleets of electric vehicles and hydrogen cars, as well as more than tripling the country's solar and wind power generation capacity to 42.7GW at the end of 2025 from 12.7GW currently.
Moon's comments were welcomed by UN Secretary General Antonio Guterres, who said South Korea "joins a growing group of major economies committed to lead by example in building a sustainable, carbon neutral and climate resilient world by 2050".
Related news posts
BP inks another LNG deal with Korea's Kogas: Correction
BP inks another LNG deal with Korea's Kogas: Correction
Corrects total volume of LNG supplied in paragraph 2 Singapore, 29 April (Argus) — BP has signed another long-term LNG sales and purchase agreement with South Korean state-owned importer Kogas, the former said today. BP will provide Kogas with up to 9.8mn t of LNG over 11 years from mid-2026 on a des basis. But other details regarding pricing and the origin of the contracted supplies were not available. This most recent deal is in addition to the existing long-term sales and purchase agreement between the two companies that was signed in 2022. Kogas on 22 April 2022 signed an 18-year LNG purchase agreement to buy 1.58mn t/yr of LNG from BP that will begin in 2025. Australian independent Woodside Energy and Kogas in February signed a sales and purchase deal for term supplies of LNG to South Korea. The deal for 500,000 t/yr on a des basis will start in 2026 and run for 10½ years. Kogas may be seeking more imported term supply as the firm has increased its downstream contractual supply deals. Kogas signed a series of deals to supply gas to subsidiaries of the country's state-controlled utility Kepco in December 2023. By Simone Tam Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
S Korea’s SK Innovation sees firm 2Q refining margins
S Korea’s SK Innovation sees firm 2Q refining margins
Singapore, 29 April (Argus) — South Korean refiner SK Innovation expects refining margins to remain elevated in this year's second quarter because of continuing firm demand, after achieving higher operating profits in the first quarter. SK expects demand to remain solid in the second quarter given a strong real economy, expectations of higher demand in emerging markets and continuing low official selling price (OSP) levels. This is despite the US Federal Reserve's high interest rate policy and oil price rallies, which are weighing on crude demand. The company's sales revenue dropped to 18.9 trillion won ($13.7bn) in the first quarter, down by 3.5pc on the previous quarter. Its energy and chemical sales accounted for 91pc of total revenue, while battery and material sales accounted for the remaining 9pc. But SK's operating profit increased to W624.7bn in January-March from W72.6bn the previous quarter. This came as its refining business flipped from an operating loss of W165bn in October-December to an operating profit of W591.1bn in the first quarter. SK attributed this increase to elevated refining margins because of higher oil prices, as well as Opec+ production cut agreements and OSP reductions. First-quarter gasoline refining margins almost doubled on the previous quarter from $7.60/bl to $13.30/bl, although diesel and kerosine edged down to $23.10/bl and $21.10/bl respectively. SK Innovation's 840,000 b/d Ulsan refinery operated at 85pc of its capacity in the fourth quarter, steady from 85pc in the previous quarter but higher than 82pc for all of 2023. The refiner's 275,000 b/d Incheon refinery's operating rate was at 88pc, up from 84pc in the fourth quarter and from 82pc in 2023. SK plans to carry out turnarounds at its 240,000 b/d No.4 crude distillation unit and No.1 residual hydrodesulphuriser, both at Ulsan, in the second quarter. Its No.2 paraxylene unit in Ulsan will have a turnaround in the same quarter. By Tng Yong Li Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
Singapore’s Jadestone cuts 2024 output guidance
Singapore’s Jadestone cuts 2024 output guidance
Sydney, 29 April (Argus) — Singapore-listed independent Jadestone Energy has cut its 2024 oil and gas production guidance, citing disappointing first-quarter group production. Jadestone said the impact of planned and unplanned downtime across its portfolio resulted in it narrowing its guidance from 20,000-23,000 bl of oil equivalent (boe/d) to 20,000-22,000 boe/d in its results for 2023 published on 29 April. Average production for January-March was 17,200 boe/d, which Jadestone said reflected the impact on its Australian assets, including the 6,000 b/d Montara oil field, of an active cyclone season at the start of 2024. The firm produced 14,000 b/d in 2023, up from 11,500 b/d in 2022. But problems at Montara and lower realised oil prices resulted in a loss of $91mn in 2023 following a $9mn profit recorded in 2023. Jadestone's realised oil price of $87.34/boe in 2023 was 16pc lower than $103.85/boe a year earlier. Proved and probable reserves at the end of 2023 totalled 68mn boe, a 5pc increase on a year's earlier 64.8mn boe, mainly because of the acquisition of a 9.52pc stake in Thailand's Sinphuhorm gas field and increases at the Cossack, Wanaea, Lambert and Hermes oil fields offshore Australia and the Akatara gas field in Indonesia's Sumatra. By Tom Major Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
Australia’s QPM hikes gas reserves estimate
Australia’s QPM hikes gas reserves estimate
Sydney, 29 April (Argus) — The energy arm of Australian battery metals firm Queensland Pacific Metals (QPM) has announced its certified reserves have increased more than a third on previous estimates at its Moranbah gas project (MGP) in Queensland state. QPM Energy (QPME) reported a 38pc increase in its total proven and probable (2P) gas reserves to 331PJ (8.8bn m³) on 29 April compared with a March 2022 estimate of 240PJ, as it pivots towards its energy business and pauses spending on its proposed Townsville Energy Chemicals Hub (TECH) project . QPME's waste coal mine gas reserves will be developed along with 300MW of new gas-fired power generation at the firm's Moranbah facilities located in the Bowen basin, a metallurgical and thermal coal producing region. The company is also planning to build compressed natural gas and micro-LNG facilities to distribute gas to northern Queensland customers. The company will seek to increase its output by 25pc to 35 TJ/d (935,000 m³/d) by late 2024, up from October-December 2023's average of 28 TJ/d by drilling a further seven wells by the year's end. A rig has arrived on site for drilling the first well of its Teviot Brook South Well programme, QPM said on 24 April. Australian independent Blue Energy, which is developing the Sapphire pilot project with 59PJ of 2P reserves near MGP, said QPM has confirmed it intends on taking gas Blue makes available to the MGP, in line with an existing non-binding agreement signed in June last year. Blue and QPME's parent company QPM also have a separate non-binding deal for supply of 7 PJ/yr of gas over 15 years to the TECH project. By Tom Major Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
Business intelligence reports
Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.
Learn more