Viewpoint: Rare earths industry at a pivotal moment

  • Market: Metals
  • 12/10/21

Electrification of the transport sector is a once in a lifetime opportunity for the rare earths industry but the challenges are considerable and will require strong collaboration across the supply chain and across borders.

"We have to collectively work out what needs to happen for the rare earths industry to capture this moment of rapid technological change and build the global magnet supply chains to sustain it," Canadian firm Neo Performance Materials' chief executive, Constantine Karayannopoulos, told delegates at this week's Metal Events 17th International Rare Earths Conference in London. "If the supply has to come from a single source, such as China, or from projects or operations that do not exist yet, I think the big OEMs [original equipment manufacturers] will be reluctant to fully commit to the technology," he added.

Motors with neodymium iron boron rare earth magnets — most of which also contain praseodymium, terbium and dysprosium — are widely accepted to be the most efficient way of converting electrical energy into motion in a vehicle. This makes them the obvious choice. But nothing is that simple.

OEMs in Germany are understood to be setting goals of a diversified, resilient and fully environmental and social governance-compliant rare earth magnet supply chain by 2025. To industry observers that is a startling deadline. But it is also no less startling than some of the government commitments around the world on phasing out the use of internal combustion engine vehicles.

Leaving aside the technical and financial challenge, rare earths have an image problem. A history of poor mining practices, pollution and political conflict have done enormous damage to the industry.

Rare earth prices soared to unmanageably high levels in 2010-11, when China temporarily restricted exports following a dispute with Japan. Buyers around the world panicked and there was a big push to cut back consumption and design away from rare earths.

The way forward

"Real change needs to be led by the biggest ultimate customers, the OEMs. They need to make their views known. There is nothing mysterious about supply chains — they form rationally as a result of demand pull," Karayannopoulos said. "The customers with their choices dictate what the automakers need to produce and in turn the automakers pull their Tier 1s. And governments need to create the regulatory framework," he added.

Government initiatives in the EU, the UK, the US and Australia, among other countries, are slowly starting to gather momentum.

Looking across the entire industry, it is difficult to imagine any solution restricted to one country, company or entity. "Working across borders, looking out not in is the only way we are going to see some of the change we need," said Will Drury, Driving the Electric Revolution Challenge Director at government-sponsored public body UK Research and Investment.

By Caroline Messecar


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
26/04/24

Japan’s JBIC to finance Chilean copper mine development

Japan’s JBIC to finance Chilean copper mine development

Osaka, 26 April (Argus) — Japan is enhancing its financial support for the development of copper mines in Chile, as part of efforts to increase its self-efficiency of base metals. State-owned Japan Bank for International Co-operation (JBIC) on 25 April signed a $248mn loan agreement with Chile-based joint-venture Compania Minera Arqueros (CMAQ) to finance development of its Arqueros copper project in Chile. CMAQ is 80pc owned by Japanese copper producer Nittetsu Mining and 20pc by Chilean firm Fondo de Inversion Privado Talcuna. The load will be co-financed by other Japanese private-sector financial firms, including Sumitomo Mitsui Banking, Mizuho Bank and MUFG Bank. The total co-funding will be $355mn. CMAQ plans to use the funding to develop Arqueros, located 35km northeast of La Serena. The mine is expected to produce 1.8mn t/yr of crude ore and 55,000 t/yr of copper concentrates for 15 years. The company aims to start operations in 2026. Nittetsu is to secure all the output from the project. The latest deal follows last month's loan agreement by JBIC and other financial institutes to provide $2.5bn to develop the Centinela copper mine in Chile . Japan relies on all its copper concentrates demand from imports, which has prompted the government to secure long-term and stable supplies of copper resources. The country's strategic energy plan has a target to achieve at least an 80pc self-sufficiency for base metals, including copper, by 2030. By Motoko Hasegawa Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Read more
News

US economic growth slows to 1.6pc in 1Q


25/04/24
News
25/04/24

US economic growth slows to 1.6pc in 1Q

Houston, 25 April (Argus) — The US economy in the first quarter grew at a 1.6pc annual pace, slower than expected, while a key measure of inflation accelerated. Growth in gross domestic product (GDP) slowed from a 3.4pc annual rate in the fourth quarter, the Bureau of Economic Analysis (BEA) reported on Thursday. The first-quarter growth number, the first of three estimates for the period, compares with analyst forecasts of about a 2.5pc gain. Personal consumption slowed to a 2.5pc annual rate in the first quarter from a 3.3pc pace in the fourth quarter, partly reflecting lower spending on motor vehicles and gasoline and other energy goods. Gross private domestic investment rose by 3.2pc, with residential spending up 13.9pc after a 2.8pc expansion in the fourth quarter. Government spending growth slowed to 1.2pc from 4.6pc. Private inventories fell and imports rose, weighing on growth. The core personal consumption expenditures (PCE) price index, which the Federal Reserve closely follows, rose by 3.7pc following 2pc annual growth in the fourth quarter, although consultancy Pantheon Macroeconomics said revisions to the data should pull the index lower in coming months. The Federal Reserve is widely expected to begin cutting its target lending rate in September following sharp increases in 2022 and early 2023 to fight inflation that surged to a high of 9.1pc in June 2022. By Bob Willis Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Australia's MinRes posts higher 1Q spodumene output


25/04/24
News
25/04/24

Australia's MinRes posts higher 1Q spodumene output

Singapore, 25 April (Argus) — Perth-based major lithium and iron ore producer Mineral Resources (MinRes) has reported higher total spodumene concentrate output from its sites in January-March, and higher spodumene prices later in the quarter. Total attributable spodumene concentrate production of the firm across its assets rose to 170,000 dry metric tonnes (dmt) (see table for detailed breakdown), up by 3.7pc on the quarter and by 63pc on the year, according to the firm's latest quarterly activity report. Total attributable spodumene concentrate shipped volumes fell by 2.9pc on the quarter but rose by 50pc on the year to 166,000dmt. MinRes has an ambitious target of 1mn t/yr of lithium attributable within the next four years, said its managing director Chris Ellison last month during the firm's half-year results presentation. The firm has been aggressively expanding, several delegates told Argus at the Tribeca Future Facing Commodities conference held in Singapore on 26 March. The firm last month agreed to buy fellow developer Poseidon Nickel's concentrator plant in Western Australia as it seeks to retrofit it for lithium processing. MinRes' Mount Marion site saw higher output, driven by higher plant utilisation and improved ore recoveries as the firm continues to advance its plant improvement initiatives. The realised price for spodumene concentrate out of its Mount Marion site was at $718/dmt on a 4.2pc-grade basis, which was above the product's year-to-date fob costs of A$518/dmt ($338/dmt). The realised price translates to $1,048/dmt for 6pc-grade lithium concentrate (spodumene), said the firm. The firm did not process the spodumene concentrate produced from its Wodgina site during the quarter into lithium battery chemicals, citing "prevailing pricing dynamics", but instead resumed spodumene concentrate spot sales. The realised spodumene concentrate price at the site came in at $974/dmt on 5.6pc-grade basis, which translates to $1,028/dmt for 6pc-grade lithium concentrate (spodumene). The lithium battery chemical realised price, excluding value added tax, came in at $11,098/t. MinRes in November 2023 finalised the acquisition of the Bald Hill lithium mine from Alita Resources. January-March was the mine's first full production quarter, hence output was dragged down by limited availability of higher-grade feed, but this is expected to recover in April-June, said the firm. The realised spodumene concentrate price at the Bald Hill site was $878/dmt on 5.1pc-grade basis, which translates to $1,016/dmt for 6pc-grade spodumene concentrate. Argus -assessed prices for 6pc grade spodumene concentrate dipped to $1,080-1,180/t cif China on 23 April, from $1,100-1,200/t cif China a week earlier. Salts producers reduced spodumene bid prices because of a fall in salts prices two weeks earlier. By Joseph Ho MinRes lithium performance Jan-Mar '24 Oct-Dec '23 Jan-Mar '23 Spodumene concentrate production (k dmt) Mt Marion (50pc attributable basis) 91 83 60 Wodgina (50pc attributable basis) 49 55 44 Bald Hill (100pc attributable basis) 30 26 NA Total 170 164 104 Spodumene concentrate shipments (k dmt) Mt Marion (50pc attributable basis) 76 86 62 Wodgina (50pc attributable basis) 64 65 49 Bald Hill (100pc attributable basis) 26 20 NA Total 166 171 111 Lithium battery chemical (t) Wodgina production (50pc attributable basis) 6,793 6,798 3,246 Wodgina sales (50pc attributable basis) 6,954 6,474 1,504 Source: MinRes MinRes previously owned 40pc of the Wodgina project, which increased to 50pc starting from 18 October 2023. Figures for Wodgina before 18 October 2023 were on 40pc attributable basis. Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

EV demand slowdown cuts S Korea’s LGES' profit in 1Q


25/04/24
News
25/04/24

EV demand slowdown cuts S Korea’s LGES' profit in 1Q

Singapore, 25 April (Argus) — South Korea's top battery manufacturer LG Energy Solution (LGES) reported significant lower revenue and profit in January-March, because of lower battery metal prices and slower electric vehicle (EV) demand. LGES' revenue in January-March fell by 23pc on the quarter and 30pc on the year to 6.13 trillion won ($4.46bn), owing to lower demand for EV pouch cells and energy storage system (ESS), with "prolonged metal price impact" affecting its average selling price. The firm reported W157bn of operating profit in January-March, but would have reported an operating loss of W32bn if it did not receive almost W189bn in US Inflation Reduction Act (IRA) tax credits. But this was still a sharp drop from W633bn of operating profit for January-March 2023. The lower revenue and a demand slowdown in the EV market led to utilisation rate adjustments that weighed on its financial performance. The firm reaped a net profit of W212bn during the quarter, which was up by 12pc on the quarter but down by around 62pc on the year, likely significantly propped up by the US' IRA tax credits. LGES said it will continue to invest despite the difficult market environment, but will "adjust" the size of its capital expenditure and execution speed "as per priority". Battery project updates LGES and automaker General Motors in early April completed the first battery shipment out of their second Ultium battery cell factory in US' Tennessee. The plant's capacity is expected to gradually expand to 50 GWh/yr, said LGES. Construction progress at the firm's battery manufacturing complex in US' Arizona is also on track, said the firm. Ramped up capacity is expected to be 53 GWh/yr, which will comprise 36 GWh/yr of 46-series cylindrical battery for EVs and 17 GWh/yr of lithium-iron-phosphate battery for ESS. LGES' 10 GWh/yr Indonesian battery production joint venture with South Korean conglomerate Hyundai Motor has also started mass production. Its battery module production joint venture with automaker Stellantis in US' Ontario, which encountered a halt in construction in May last year, will start operations in the second half of 2024. The factory has a planned capacity of 45GWh/yr and was supposed to begin operations early this year. LGES earlier this year inked a second agreement with Australian firm Wesfarmers Chemicals, Energy and Fertilisers for lithium concentrate supply. The firm will continue building a raw materials supply chain within regions that have a free trade agreement with US, it said. By Joseph Ho Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Barge delays at Algiers lock near New Orleans


24/04/24
News
24/04/24

Barge delays at Algiers lock near New Orleans

Houston, 24 April (Argus) — Barges are facing lengthy delays at the Algiers lock near New Orleans as vessels reroute around closures at the Port Allen lock and the Algiers Canal. Delays at the Algiers Lock —at the interconnection of the Mississippi River and the Gulf Intracoastal Waterway— have reached around 37 hours in the past day, according to the US Army Corps of Engineers' lock report. Around 50 vessels are waiting to cross the Algiers lock. Another 70 vessels were waiting at the nearby Harvey lock with a six-hour wait in the past day. The closure at Port Allen lock has spurred the delays, causing vessels to reroute through the Algiers lock. The Port Allen lock is expected to reopen on 28 April, which should relieve pressure on the Algiers lock. Some traffic has been rerouted through the nearby Harvey lock since the Algiers Canal was closed by a collapsed powerline, the US Coast Guard said. The powerline fell on two barges, but no injuries or damages were reported. The wire is being removed by energy company Entergy. The canal is anticipated to reopen at midnight on 25 April. By Meghan Yoyotte Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more