Aquila Resources to sell Australian coal assets
Chinese-Australian mining firm Aquila Resources has begun selling its Queensland coal assets in Australia, as it capitalises on strong coal prices and turns to developing an iron ore project in Western Australia (WA).
Aquila, which is owned 85pc by China's Baosteel and 15pc by Australian mining firm Mineral Resources (MinRes), has put its 1.9mn t/yr Walton low ash, low-volatile PCI coal mine and 3.6mn t/yr Talwood coking and thermal coal mine in Queensland up for sale. The proposed sale follows this month's agreement by UK-Australian mining firm BHP to sell its 80pc stake in the BHP Mitsui Coal joint venture to Stanmore, as high metallurgical coal prices increase merger and acquisition activity.
There are several possible buyers of the Aquila assets, including Australian firms Fitzroy Resources, Bowen Coking Coal, QCoal, Whitehaven and Stanmore, as well as Japanese firms Sojitz and Idemitsu, and US-Australian coal mining firm Coronado. All are looking to expand metallurgical coal output to capitalise on record high export prices. Stanmore may be too busy bedding down its BMC acquisition to participate, but those that missed out may be interested in the Aquila assets.
Walton is the most advanced of the two projects, with the environmental approvals process underway, while Talwood is in early stage studies and would take some time to come to market.
Baosteel bought Aquila for $1.4bn in 2014, which also gave it 50pc of the 4.5mn t/yr Eagle Downs hard coking coal mine. The other 50pc is owned by Australian-South African mining firm South32, which decided not to proceed to develop Eagle Downs at the beginning of 2021 and signalled its intention last month to divest its stake. It is unclear if Aquila intends to sell its stake in Eagle Downs or the 2.6mn t/yr Washpool hard coking coal project, which is also in Queensland.
Aquila also holds 50pc of the 30mn t/yr Australian Premium Iron (API) project in the Pilbara region of WA. MinRes, which is based in WA and focused on iron ore, acquired its stake in Aquila in June from rail firm Aurizon and was clear that its interest was in the API project rather than the Queensland coal assets.
Spot premium hard coking coal prices more than trebled from early May to a high of $409.75/t fob Australia in mid-September before easing slightly. Argus last assessed the premium hard low-volatile coking coal price at $375.50/t fob Australia on 15 November, up from $110.95/t on 11 May. Lower grade metallurgical coal prices have also increased at a slightly lower rate. Argus last assessed the PCI low-volatile price at $252.50/t fob Australia, down from a high of $282/t on 22 October but up from $106.50 on 17 May.
Related news posts
Automakers divert away from blocked Baltimore port
Automakers divert away from blocked Baltimore port
Pittsburgh, 27 March (Argus) — Automakers are adjusting their supply routes following yesterday's collapse of the Francis Scott Key Bridge at the Port of Baltimore, the busiest US port for auto shipments. The Port of Baltimore handled 847,158 autos and light trucks last year, more than any other US port, according to the Maryland state data, with imports accounting for about 75pc of the volume, the Alliance for Automotive Innovation said. With vessel traffic in and out of the port suspended indefinitely automakers said they will reroute deliveries though other east coast ports. This includes General Motors, which said it still expects minimal impact on its operations. Ford said it has already secured shipping alternatives where workarounds are necessary, but did not share details. For Mercedes-Benz, Baltimore is among its busiest ports for imports. The company said it has flexibility to adjust its supply routes and noted ports in Charleston, South Carolina, and Brunswick, Georgia, as other top import locations. The port closure has no effect on Mercedes vehicle exports or parts supply at its Tuscaloosa, Alabama plant, the company said. Volkswagen Group, which includes the Audi and Porsche brands, said it received about 100,000 vehicles last year through Baltimore to ship to US dealers in the Mid-Atlantic and northeast, but its operations will not be limited since its facility is located on the seaboard side of the bridge, at Sparrows Point. Volkswagen said it may see some trucking delays from highway rerouting, however. Toyota relies on the Port of Baltimore primarily for vehicle exports, but said it is not the company's main North American port. Stellantis, maker of numerous brands including Chrysler and Jeep, said it has begun discussions with transportation providers to ensure an uninterrupted flow of vehicles. The US imported 723,435 cars and light trucks in January, up from 634,228 a year earlier, according to customs data. Mexico supplied just over one-third or 2.97mn of the total number of US vehicle imports in 2023, followed by Japan and Canada, with 17.3pc and 16.3pc, respectively. By James Marshall Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
Red Sea tensions could halt EU India HRC quota overfill
Red Sea tensions could halt EU India HRC quota overfill
London, 27 March (Argus) — Elevated shipping times caused by tensions in the Red Sea could prevent India's hot-rolled coil (HRC) safeguard quota in the EU from overfilling on 1 April, as participants had expected. India shipped just over 520,000t of HRC to the EU in December and January, according to customs data, all of which appears to have been cleared into the first-quarter quota. Including unused tonnage rolled over from the previous quarter, this quota totalled 574,550t, with just 46,934t currently unused, meaning that 527,000t is utilised. This suggests that material shipped from India in February will predominantly comprise the April-June quota of 294,662t. Vessel tracking data show that India shipped 404,582t of flat-rolled products to the EU in February, although the data do not give detail by product. Indian material could theoretically use one-third of the other countries' quota in April-June too, under the safeguard regulation. That quota will fill quickly again, as has been the case in recent quarters. Longer shipment times mean that most Indian material shipped in the second half of February — 215,170t of flat-rolled — will arrive after 1 April, and either be cleared or held over until the next quarter: after day one, any material cleared above the quota amount pays a straight 25pc duty, so it is likely that some will be held over from April-June and clear into the July quota. Vessels going round the Cape of Good Hope rather than sailing through the Red Sea will take an average of 45.5 days to arrive at EU ports from India in April, according to data from Kpler. Vessels arriving by the Red Sea in January were taking around half this time, or even less. This means that around 189,000t of February shipments could be cleared into the April-June quotas on 1 April, plus tonnage held over from the current period, totalling 46,934t for HRC. Assuming that all the material shipped in the first half of February is HRC, the quota would not overfill on day one, even with the material held over from this quarter factored in. But it is expected to fill later in the month. By Colin Richardson Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
Chile outlines plan to double lithium production
Chile outlines plan to double lithium production
Santiago, 27 March (Argus) — Chile will use three different business models to expand its lithium production that it estimates could increase by 70pc by 2030 and 100pc over the next decade, finance minister Mario Marcel said. Chile is the world's second-largest lithium producer with an estimated output in 2023 of 234,000 tonnes of lithium carbonate equivalent (LCE), according to US Geological Survey data. The first model announced late on Tuesday envisages public-private alliances, with the state holding a majority share, in two salt lakes that have been defined as strategic: Atacama in the Antofagasta region and Maricunga in the Atacama region. Public-private alliances will also be promoted in five other salt lakes — covering Pedernales and the Alto Andino project area — where the state will seek the "best agreement" to develop projects with private partners, giving it either a majority or minority role. The third model gives the private sector leadership in the development of 26 other salt lakes in which associations may be formed with state companies but will not be a requisite, said Marcel. Private investors will be asked to submit Requests for Information (RFI) to express interest in these salt lakes in April and the RFI results announced in July. Subsequent tender processes will lead to special lithium operating contracts (CEOL). "During this government, we will sign a group of CEOLs in which the private sector will lead production in which the state will not be a major partner," said economy minster Nicolas Grau. Another 38 salt lakes will be defined as protected areas where development cannot take place to meet Chile's commitments under the Convention of Biological Diversity. Chile has the world's largest proven reserves of lithium but laws passed in the 1970s and 1980s restricted its access to private developers. Chilean SQM and US Albemarle, the country's only producers, operate in the Atacama salt lake under leases with state development agency Corfo. The plan comes almost a year after President Gabriel Boric announced Chile's intention to open lithium mining to private investment in April 2023 as part of its national lithium strategy. By Emily Russell Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
RMKO, Atlas to develop Sumatra coal crushing plant
RMKO, Atlas to develop Sumatra coal crushing plant
Manila, 27 March (Argus) — Indonesian coal mining contractor RMKO has partnered with domestic producer Atlas Resources to develop a coal crushing plant and other supporting mining infrastructure in south Sumatra. The crushing plant and other facilities are targeted for completion by the second half of this year, said RMKO, which is a subsidiary of coal logistics firm RMK. The plant will be built at Atlas' Mutara hub, which consists of five separate concessions in the Musi Rawas and Musi Banyuasin regency in south Sumatra and has coal reserves totalling 85mn t. Atlas has already acquired a road construction permit that will connect Mutara to the Sriwijaya Bara logistics jetty 137km away. The coal crushing plant is expected to boost coal transportation from mines to clients outside the region, the company said. RMKO will construct and operate the coal crushing plant that will have a capacity of 650 t/hr. Other services will include stockpile management, loading services and plant maintenance. The 36bn rupiah ($2.28mn) plant will be funded by RMK with Atlas paying back the investment through coal production equivalent to 200,000 t/month for five years, as well as the cost of operations and maintenance services, RMKO said. By Antonio delos Reyes Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.
Business intelligence reports
Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.
Learn more