Rio Tinto aims low for 2022 Australian iron ore target

  • Market: Metals
  • 18/01/22

UK-Australian mining firm Rio Tinto has set an unambitious 2022 iron ore shipment target of 320mn-335mn t from its mines in Western Australia (WA) amid warnings that Covid-19-related skills shortages and greater attention to heritage issues may disrupt production.

Rio Tinto shipped 321.59mn t of iron ore last year on a 100pc basis from its WA operations, down from 330.57mn t in 2020 and near the bottom of its 320mn-321mn t 2021 guidance, which it revised down from 325mn-340mn t in October.

The firm warned that the 2022 guidance was subject to the successful commissioning and ramp up of new iron ore projects, with its 43mn t/yr Gudai-Darri mine further delayed. The guidance is also subject to the impact of new cultural heritage laws, which have been instigated in response to its destruction of the Juukan gorge in June 2020 that forced a major management restructure at Rio Tinto.

Rio Tinto has pushed first production from its main plant at Gudai-Darri, formerly known as Koodaideri, back into the April-June quarter from January-March this year, warning that labour shortages in WA and Covid-19 restrictions could further delay the project. These issues have also delayed the ramp up of the Robe Valley brownfield mine replacement projects at West Angelas C and D, and the Western Turner Syncline phase two projects.

The delays to these projects forced Rio Tinto to ship more of its low-grade SP10 ore in both October-December and full-year 2021 than in the same periods of 2020. This increased stocks at its Chinese port operations to 8.8mn t at the end of December 2021 from 1.7mn t a year earlier as it was unable to secure sufficient high-grade ore to blend out the lower-grade material. The firm expects its shipments of SP10 to gradually decrease as the new mines ramp up in the first half of this year and to settle around 6pc of total production in the medium term, down from 18.5pc in October-December.

Chinese portside sales rose to 14mn t in 2021 from 5.5mn t in 2020. Rio Tinto sells blends of its WA, Canadian and third-party ores at its Chinese portside operations.

Rio Tinto received an average price of $121.20/dry metric tonne (dmt) fob Pilbara ports in July-December, down from $168.40/dmt in January-June. Around 11pc of shipments in 2021 were priced based on the prior quarter's average lagged by one month. The remainder are sold on current quarter, current month or spot pricing, with 28pc of the total sold as fob.

Argus last assessed the ICX iron ore price yesterday at $124.60/dmt cfr Qingdao on a 62pc Fe basis, up from $90.71/dmt on 17 November.

The Iron ore Company of Canada (IOC), in which Rio Tinto has a 58.7pc interest, produced 16.56mn t of pellet and concentrate in 2021 on a 100pc basis, which was down by 6pc from the previous year. Rio Tinto expects IOC to produce 17mn-18.7mn t in 2022 on a 100pc basis.

Rio Tinto iron ore shipmentsmn t
Ore typeOct-Dec '21Jul-Sep '21Oct-Dec '20FY2021FY2020
Pilbara Blend Lump16.6216.7120.1564.777.12
Pilbara Blend Fines31.6236.242.73138.2155.53
Robe Valley Lump21.812.357.518.69
Robe Valley Fines4.224.845.7817.7321.65
Yandicoogina Fines14.1214.9115.0556.8957.75
SP10 Lump4.844.831.0416.083.88
SP10 Fines10.684.061.7720.495.95
Total shipments84.183.3688.87321.59330.57
On a 100pc ownership basis

Iron ore prices $/dmt

Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
25/04/24

US economic growth slows to 1.6pc in 1Q

US economic growth slows to 1.6pc in 1Q

Houston, 25 April (Argus) — The US economy in the first quarter grew at a 1.6pc annual pace, slower than expected, while a key measure of inflation accelerated. Growth in gross domestic product (GDP) slowed from a 3.4pc annual rate in the fourth quarter, the Bureau of Economic Analysis (BEA) reported on Thursday. The first-quarter growth number, the first of three estimates for the period, compares with analyst forecasts of about a 2.5pc gain. Personal consumption slowed to a 2.5pc annual rate in the first quarter from a 3.3pc pace in the fourth quarter, partly reflecting lower spending on motor vehicles and gasoline and other energy goods. Gross private domestic investment rose by 3.2pc, with residential spending up 13.9pc after a 2.8pc expansion in the fourth quarter. Government spending growth slowed to 1.2pc from 4.6pc. Private inventories fell and imports rose, weighing on growth. The core personal consumption expenditures (PCE) price index, which the Federal Reserve closely follows, rose by 3.7pc following 2pc annual growth in the fourth quarter, although consultancy Pantheon Macroeconomics said revisions to the data should pull the index lower in coming months. The Federal Reserve is widely expected to begin cutting its target lending rate in September following sharp increases in 2022 and early 2023 to fight inflation that surged to a high of 9.1pc in June 2022. By Bob Willis Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Read more
News

Australia's MinRes posts higher 1Q spodumene output


25/04/24
News
25/04/24

Australia's MinRes posts higher 1Q spodumene output

Singapore, 25 April (Argus) — Perth-based major lithium and iron ore producer Mineral Resources (MinRes) has reported higher total spodumene concentrate output from its sites in January-March, and higher spodumene prices later in the quarter. Total attributable spodumene concentrate production of the firm across its assets rose to 170,000 dry metric tonnes (dmt) (see table for detailed breakdown), up by 3.7pc on the quarter and by 63pc on the year, according to the firm's latest quarterly activity report. Total attributable spodumene concentrate shipped volumes fell by 2.9pc on the quarter but rose by 50pc on the year to 166,000dmt. MinRes has an ambitious target of 1mn t/yr of lithium attributable within the next four years, said its managing director Chris Ellison last month during the firm's half-year results presentation. The firm has been aggressively expanding, several delegates told Argus at the Tribeca Future Facing Commodities conference held in Singapore on 26 March. The firm last month agreed to buy fellow developer Poseidon Nickel's concentrator plant in Western Australia as it seeks to retrofit it for lithium processing. MinRes' Mount Marion site saw higher output, driven by higher plant utilisation and improved ore recoveries as the firm continues to advance its plant improvement initiatives. The realised price for spodumene concentrate out of its Mount Marion site was at $718/dmt on a 4.2pc-grade basis, which was above the product's year-to-date fob costs of A$518/dmt ($338/dmt). The realised price translates to $1,048/dmt for 6pc-grade lithium concentrate (spodumene), said the firm. The firm did not process the spodumene concentrate produced from its Wodgina site during the quarter into lithium battery chemicals, citing "prevailing pricing dynamics", but instead resumed spodumene concentrate spot sales. The realised spodumene concentrate price at the site came in at $974/dmt on 5.6pc-grade basis, which translates to $1,028/dmt for 6pc-grade lithium concentrate (spodumene). The lithium battery chemical realised price, excluding value added tax, came in at $11,098/t. MinRes in November 2023 finalised the acquisition of the Bald Hill lithium mine from Alita Resources. January-March was the mine's first full production quarter, hence output was dragged down by limited availability of higher-grade feed, but this is expected to recover in April-June, said the firm. The realised spodumene concentrate price at the Bald Hill site was $878/dmt on 5.1pc-grade basis, which translates to $1,016/dmt for 6pc-grade spodumene concentrate. Argus -assessed prices for 6pc grade spodumene concentrate dipped to $1,080-1,180/t cif China on 23 April, from $1,100-1,200/t cif China a week earlier. Salts producers reduced spodumene bid prices because of a fall in salts prices two weeks earlier. By Joseph Ho MinRes lithium performance Jan-Mar '24 Oct-Dec '23 Jan-Mar '23 Spodumene concentrate production (k dmt) Mt Marion (50pc attributable basis) 91 83 60 Wodgina (50pc attributable basis) 49 55 44 Bald Hill (100pc attributable basis) 30 26 NA Total 170 164 104 Spodumene concentrate shipments (k dmt) Mt Marion (50pc attributable basis) 76 86 62 Wodgina (50pc attributable basis) 64 65 49 Bald Hill (100pc attributable basis) 26 20 NA Total 166 171 111 Lithium battery chemical (t) Wodgina production (50pc attributable basis) 6,793 6,798 3,246 Wodgina sales (50pc attributable basis) 6,954 6,474 1,504 Source: MinRes MinRes previously owned 40pc of the Wodgina project, which increased to 50pc starting from 18 October 2023. Figures for Wodgina before 18 October 2023 were on 40pc attributable basis. Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

EV demand slowdown cuts S Korea’s LGES' profit in 1Q


25/04/24
News
25/04/24

EV demand slowdown cuts S Korea’s LGES' profit in 1Q

Singapore, 25 April (Argus) — South Korea's top battery manufacturer LG Energy Solution (LGES) reported significant lower revenue and profit in January-March, because of lower battery metal prices and slower electric vehicle (EV) demand. LGES' revenue in January-March fell by 23pc on the quarter and 30pc on the year to 6.13 trillion won ($4.46bn), owing to lower demand for EV pouch cells and energy storage system (ESS), with "prolonged metal price impact" affecting its average selling price. The firm reported W157bn of operating profit in January-March, but would have reported an operating loss of W32bn if it did not receive almost W189bn in US Inflation Reduction Act (IRA) tax credits. But this was still a sharp drop from W633bn of operating profit for January-March 2023. The lower revenue and a demand slowdown in the EV market led to utilisation rate adjustments that weighed on its financial performance. The firm reaped a net profit of W212bn during the quarter, which was up by 12pc on the quarter but down by around 62pc on the year, likely significantly propped up by the US' IRA tax credits. LGES said it will continue to invest despite the difficult market environment, but will "adjust" the size of its capital expenditure and execution speed "as per priority". Battery project updates LGES and automaker General Motors in early April completed the first battery shipment out of their second Ultium battery cell factory in US' Tennessee. The plant's capacity is expected to gradually expand to 50 GWh/yr, said LGES. Construction progress at the firm's battery manufacturing complex in US' Arizona is also on track, said the firm. Ramped up capacity is expected to be 53 GWh/yr, which will comprise 36 GWh/yr of 46-series cylindrical battery for EVs and 17 GWh/yr of lithium-iron-phosphate battery for ESS. LGES' 10 GWh/yr Indonesian battery production joint venture with South Korean conglomerate Hyundai Motor has also started mass production. Its battery module production joint venture with automaker Stellantis in US' Ontario, which encountered a halt in construction in May last year, will start operations in the second half of 2024. The factory has a planned capacity of 45GWh/yr and was supposed to begin operations early this year. LGES earlier this year inked a second agreement with Australian firm Wesfarmers Chemicals, Energy and Fertilisers for lithium concentrate supply. The firm will continue building a raw materials supply chain within regions that have a free trade agreement with US, it said. By Joseph Ho Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Barge delays at Algiers lock near New Orleans


24/04/24
News
24/04/24

Barge delays at Algiers lock near New Orleans

Houston, 24 April (Argus) — Barges are facing lengthy delays at the Algiers lock near New Orleans as vessels reroute around closures at the Port Allen lock and the Algiers Canal. Delays at the Algiers Lock —at the interconnection of the Mississippi River and the Gulf Intracoastal Waterway— have reached around 37 hours in the past day, according to the US Army Corps of Engineers' lock report. Around 50 vessels are waiting to cross the Algiers lock. Another 70 vessels were waiting at the nearby Harvey lock with a six-hour wait in the past day. The closure at Port Allen lock has spurred the delays, causing vessels to reroute through the Algiers lock. The Port Allen lock is expected to reopen on 28 April, which should relieve pressure on the Algiers lock. Some traffic has been rerouted through the nearby Harvey lock since the Algiers Canal was closed by a collapsed powerline, the US Coast Guard said. The powerline fell on two barges, but no injuries or damages were reported. The wire is being removed by energy company Entergy. The canal is anticipated to reopen at midnight on 25 April. By Meghan Yoyotte Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Baltimore to temporarily open 4th shipping channel


24/04/24
News
24/04/24

Baltimore to temporarily open 4th shipping channel

Cheyenne, 24 April (Argus) — The Port of Baltimore is preparing to open another, deeper temporary shipping channel this week so at least some of the vessels that have been stranded at the port can depart. The new 35-ft deep Fort McHenry Limited Access Channel is scheduled to be open to commercially essential vessels from 25 April until 6am ET on 29 April or 30 April "if weather adversely impacts vessel transits," according to a US Coast Guard Marine Safety Information Bulletin. The channel will then be closed again until 10 May. The channel also will have a 300-ft horizontal clearance and 214-ft vertical clearance. This will be the fourth and largest channel opened since the 26 March collapse of the Francis Scott Key Bridge. The Unified Command has said that the new limited access channel should allow passage of about 75pc of the types of vessels that typically move through the waterway. Vessels that have greater than 60,000 long tons (60,963 metric tonnes) of displacement will likely not be able to move through the channel and those between 50,000-60,000 long tons of displacement "will be closely evaluated" for transit. There were seven vessels blocked from exiting the port as of 27 March, including three dry bulk carriers, one vehicle carrier and one tanker, according to the US Department of Transportation. Two of the bulk carriers at berth in Baltimore are Kamsarmax-sized coal vessels, data from analytics firm Kpler show. The US Army Corps of Engineers still expects to reopen the Port of Baltimore's permanent 700-foot wide, 50-foot deep channel by the end of May. The Key Bridge collapsed into the water late last month when the 116,851dwt container ship Dali lost power and crashed into a bridge support column. Salvage teams have been working to remove debris from the water and containers from the ship in order to clear the main channel. By Courtney Schlisserman Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more