PDO, Shell to explore CCUS opportunities in Oman

  • Market: Emissions, Hydrogen
  • 26/05/22

Oman's state-controlled Petroleum Development Oman (PDO) and Shell have agreed to jointly study carbon capture, utilisation and storage (CCUS) opportunities in the country.

The two have signed a preliminary agreement for a study to assess all aspects of reinjecting and storing CO2, to include technical matters, project timeframe and cost, and possible support for a regulatory and fiscal framework for CCUS in Oman.

Shell and PDO want to facilitate a low-carbon hydrogen value chain in Oman, and Shell's vice president Walid Hadi said the study "may well result in further collaboration involving additional projects [between PDO and Shell] in the future."

PDO managing director Steve Phimistersaid the collaboration "lays the foundation for PDO to reduce emissions from our operations." The firm operates Oman's giant block 6 and is the country's biggest hydrocarbons producer. It accounted for 74.5pc of Oman's oil and condensate output in 2020, up from 73pc in 2019. The use of CCUS for enhanced oil recovery (EOR) and long-term CO2 storage would be a step forward in PDO's commitment to achieve net zero emissions by 2050.

Shell operates Oman's block 10 and holds a 34pc interest in PDO. The UK-based company said it is looking closely at options for an associated downstream project based on low-carbon hydrogen value chains with CCUS.

Most CCUS facilities globally are tied to natural gas processing plants and are made economically viable through EOR.


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
01/05/24

G7 coal exit goal puts focus on Germany, Japan and US

G7 coal exit goal puts focus on Germany, Japan and US

London, 1 May (Argus) — A G7 countries commitment to phase out "unabated coal power generation" by 2035 focuses attention on Germany, Japan and the US for charting a concrete coal-exit path, but provides some flexibility on timelines. The G7 commitment does not mark a departure from the previous course and provides a caveat by stating the unabated coal exit will take place by 2035 or "in a timeline consistent with keeping a limit of 1.5°C temperature rise within reach, in line with countries' net-zero pathways". The G7 countries are Italy — this year's host — Canada, France, Germany, Japan, the UK and the US. The EU is a non-enumerated member. The announcement calls for accelerating "efforts towards the phase-out of unabated coal power generation", but does not suggest policy action. It calls for reducing "as much as possible", providing room for manoeuvre to Germany, Japan and the US. Coal exports are not mentioned in the communique. Canada and the US are net coal exporters. France, which predominantly uses nuclear power in its generation mix is already scheduled to close its two remaining coal plants by the end of this year. The UK will shut its last coal-fired plant Ratcliffe in September . Italy has ended its emergency "coal maximisation plan" and has been less reliant on coal-fired generation, except in Sardinia . The country has 6GW of installed coal-fired power capacity, with state-controlled utility Enel operating 4.7GW of this. The operator said it wanted to shut all its coal-fired plants by 2027. Canada announced a coal exit by 2030 in 2016 and currently has 4.7GW of operational coal-fired capacity. In 2021-23, the country imported an average of 5.7mn t of coal each year, mainly from the US. Germany Germany has a legal obligation to shut down all its coal plants by 2038, but the country's nuclear fleet retirement in 2023, coupled with LNG shortages after Russia's invasion of Ukraine, led to an increase in coal use. Germany pushed for an informal target to phase out coal by 2030, but the grid regulator Bnetza's timeline still anticipates the last units going offline in 2038. The G7 agreement puts into questions how the country will treat its current reliance on coal as a backup fuel. The grid regulator requires "systematically relevant" coal plants to remain available as emergency power sources until the end of March 2031 . Germany generated 9.5TWh of electricity from hard-coal fired generation so far this year, according to European grid operator association Entso-E. Extending the current rate of generation, Germany's theoretical coal burn could reach about 8.8mn t. Japan Japan's operational coal capacity has increased since 2022, with over 3GW of new units connected to the grid, according to the latest analysis by Global Energy Monitor (GEM). Less than 5pc of Japan's operational coal fleet has a planned retirement year, and these comprise the oldest and least efficient plants. Coal capacity built in the last decade, following the Fukushima disaster, is unlikely to receive a retirement date without a country-wide policy that calls for a coal exit. Returning nuclear fleet capacity is curtailing any additional coal-fired generation in Japan , but it will have to build equivalent capacity to replace its 53GW of coal generation. And, according to IEA figures, Japan will only boost renewables up to 24pc until 2030. The US The US operates the third-largest coal-power generation fleet in the world, with 212GW operational capacity. Only 37pc of this capacity has a known retirement date before 2031. After 2031, the US will have to retire coal-fired capacity at a rate of 33GW/yr for four years to be able to meet the 2035 phase-out deadline. By Ashima Sharma Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Find out more
News

Larger EU H2 bank auction could still clear below €1/kg


01/05/24
News
01/05/24

Larger EU H2 bank auction could still clear below €1/kg

Hamburg, 1 May (Argus) — The EU will launch a second European hydrogen bank auction later this year, ramping up the budget from a pilot for which results were published on 30 April. A bigger budget will allow more projects to win subsidies, but developers might still have to bid at or below €1/kg to stand a chance of being successful. As a result of the pilot, the EU will subsidise seven renewable hydrogen projects in Spain, Portugal, Norway and Finland with a total €720mn ($768mn), to be disbursed as a fixed premium per kg produced over a 10-year period. The European Commission picked the projects that requested the least support and the auction cleared at €0.48/kg, far below the bid ceiling of €4.50/kg . A second auction later this year is slated to have a much larger budget of around €2.2bn. This could open the door for projects with less competitive bids, but developers may still have to bid for less than €1/kg, data released by the commission suggest. If another €2.2bn had been available to the "next best projects" in the pilot, bringing the total budget to nearly €3bn, the auction would have cleared at around €1/kg, the data indicate. Spanish projects would have been the main beneficiaries of the larger budget. But it would have also unlocked subsidies for projects that did not field any winners in the pilot, including Germany, France, Austria and the Netherlands. This suggests that projects in these countries might be able to get subsidies in the second auction. That said, some German projects that participated in the pilot are bound to get funds from a separate €350mn budget set aside by Berlin , meaning they could not take part in the next round. In any case, the second round could clear even far below €1/kg, if developers revise their bidding strategies now they have indications from the pilot on how low they might have to go. Such signposts were not available for the first round, other than from a Danish auction last year with similar parameters — which had indicated that winning bids in the hydrogen bank pilot were likely to stay well below €1/kg . The commission plans to tighten some of the eligibility criteria for the second round , which might prevent some projects from participating again. A draft document suggests winners of the second round would have to commission their plants within three years, down from five in the pilot. And developers would have to provide a completion guarantee equivalent to 10pc of the requested subsidies, up from 4pc. The second auction will also have a lower bid ceiling of €3.50/kg based on the draft, although this is highly unlikely to be tested by the successful submissions. Budget uncertainties While previous commission comments suggested a budget of around €2.2bn for the second round, the draft rules leave the exact funds open. The commission initially earmarked €800mn for the pilot and might top up the second round with the unused €80mn. It plans to set an unspecified slice of the budget aside exclusively for projects targeting offtake for maritime transport, adding a degree of complexity. Austria is planning to top up the second auction with €400mn , while others, such as Belgium , could follow suit. Moving the needle? While bids in the pilot auction came in well below the ceiling — and are bound to do so again in the second round — the funds will only be enough to support a fraction of the EU's 10mn t/yr renewable hydrogen production target by 2030. The pilot auction will subsidise 1.58mn t, or 158,000 t/yr, of production from the seven selected projects — assuming the support they secured will be enough to get them built as planned. If the next best projects from the pilot were to repeat their bids in a €2.2bn second round successfully, the round could support close to 300,000 t/yr. While this would lift subsidised output across both auctions to nearly 460,000 t/yr, it would still be less than 5pc of the 10mn t/yr target. Assuming developers that missed out in the first round shoot lower in the second and the volume-weighted average of successful bids is in line with the pilot's €0.45/kg, 480,000 t/yr could be subsidised. Together with the pilot, this would yield 640,000 t/yr, or just over 6pc of the EU's target, although extra funds from Germany, Austria and potentially others could lift this further. The EU hopes this initial operating support, combined with subsidies for capital expenses, infrastructure developments and demand-side initiatives, will be enough to kickstart the sector and other projects will follow even without hydrogen bank support. By Stefan Krumpelmann Renewable H2 projects selected in hydrogen bank pilot auction Project Coordinator Project location H2 output t/yr Electrolyser capacity MW Bid price €/kg Requested funding mn € eNRG Lahti Nordic Ren-Gas Finland 12,200 90 0.37 45.2 El Alamillo H2 Benbros Energy Spain 6,500 60 0.38 24.6 Grey2Green-II Petrogal Portugal 21,600 200 0.39 84.2 Hysencia Angus Spain 1,700 35 0.48 8.1 Skiga Skiga Norway 16,900 117 0.48 81.3 Catalina Renato PtX Spain 48,000 500 0.48 230.5 MP2X Madoqua Power2X Portugal 51,100 500 0.48 245.2 - European Commission Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

G7 countries put timeframe on 'unabated' coal phase-out


30/04/24
News
30/04/24

G7 countries put timeframe on 'unabated' coal phase-out

London, 30 April (Argus) — G7 countries today committed to phasing out "unabated coal power generation" by 2035 — putting a timeframe on a coal phase-out for the first time. The communique, from a meeting of G7 climate, energy and environment ministers in Turin, northern Italy, represents "an historic agreement" on coal, Canadian environment minister Steven Guilbeault said. Although most G7 nations have set a deadline for phasing out coal-fired power, the agreement marks a step forward for Japan in particular, which had previously not made the commitment, and is a "milestone moment", senior policy advisor at think-tank E3G Katrine Petersen said. The G7 countries are Italy — this year's host — Canada, France, Germany, Japan, the UK and the US. The EU is a non-enumerated member. But the pledge contains a caveat in its reference to "unabated" coal-fired power — suggesting that abatement technologies such as carbon capture and storage could justify its use, while some of the wording around a deadline is less clear. The communique sets a timeframe of "the first half of [the] 2030s or in a timeline consistent with keeping a limit of 1.5°C temperature rise within reach, in line with countries' net-zero pathways". OECD countries should end coal use by 2030 and the rest of the world by 2040, in order to align with the global warming limit of 1.5°C above pre-industrial levels set out in the Paris Agreement, according to research institute Climate Analytics. The countries welcomed the outcomes of the UN Cop 28 climate summit , pledging to "accelerate the phase out of unabated fossil fuels so as to achieve net zero in energy systems by 2050". It backed the Cop 28 goal to triple renewable energy capacity by 2030 and added support for a global target for energy storage in the power sector of 1.5TW by 2030. The group committed to submit climate plans — known as nationally determined contributions (NDCs) — with "the highest possible ambition" from late this year or in early 2025. And it also called on the IEA to "provide recommendations" next year on how to implement a transition away from fossil fuels. The G7 also reiterated its commitment to a "fully or predominantly decarbonised power sector by 2035" — first made in May 2022 and highlighted roles for carbon management, carbon markets, hydrogen and biofuels. Simon Stiell, head of UN climate body the UNFCCC, urged the G7 and G20 countries to lead on climate action, in a recent speech . The group noted in today's outcome that "further actions from all countries, especially major economies, are required". The communique broadly reaffirmed existing positions on climate finance, although any concrete steps are not likely to be taken ahead of Cop 29 in November. The group underlined its pledge to end "inefficient fossil fuel subsidies" by 2025 or earlier, but added a new promise to "promote a common definition" of the term, which is likely to increase countries' accountability. The group will report on its progress towards ending those subsidies next year, it added. Fostering energy security The communique placed a strong focus on the need for "diverse, resilient, and responsible energy technology supply chains, including manufacturing and critical minerals". It noted the important of "guarding against possible weaponisation of economic dependencies on critical minerals and critical raw materials" — many of which are mined and processed outside the G7 group. Energy security held sway on the group's take on natural gas. It reiterated its stance that gas investments "can be appropriate… if implemented in a manner consistent with our climate objectives" and noted that increased LNG deliveries could play a key role. By Georgia Gratton Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

UN eyes policy crediting for carbon markets


30/04/24
News
30/04/24

UN eyes policy crediting for carbon markets

Berlin, 30 April (Argus) — The UN is considering extending the scope of carbon mitigation credit generation under the Paris climate agreement to policy implementation. The UN's climate arm has tasked research institute Perspectives Climate Group senior founding partner Axel Michaelowa with drawing up a paper on how to incorporate policy crediting into the new carbon market being developed under Article 6.4 of the Paris deal. This is expected to be finalised by the UN Cop 29 climate conference in Azerbaijan in November following persistent disagreements between countries at previous summits. Policy crediting is increasingly viewed as crucial amid the rising urgency to scale up mitigation activities, Michaelowa said at an industry event in Zurich yesterday. But policy crediting presents challenges, such as how to determine the additionality of the instruments for mitigation efforts. The World Bank, which developed the first ever policy crediting activity — the Transformative Carbon Asset Facility — in 2016, determines additionality indirectly as the difference between the facility's baseline and actual emissions. Michaelowa believes this is insufficient, urging separate additionality tests to prove the policy instrument mobilises mitigation. An eligible policy instrument typically closes the cost gap between mitigation and business-as-usual technologies, Michaelowa said. "Creditable" policy instruments are mandates, or financial incentives, for deploying low-carbon technologies or behaviours. Policies that reverse previous bad governance by eliminating obstacles to mitigation activities also qualify, Michaelowa said, for example a grid operator enforcing a stop on renewable power growth to ensure grid stability, as investments in the grid would be too costly. Uzbekistan signed an agreement under the World Bank's facility in June 2023 under which it can sell carbon credits issued for the emissions reductions resulting from its cuts to high fossil fuel subsidies. The resulting funds are used to mitigate the impact of rising energy prices on the lowest income consumers, and fund awareness campaigns on the need for cost-covering energy tariffs. Uzbekistan expects to reduce its emissions by 60mn t of CO2 equivalent (CO2e) between 2022-27 as a result of the cuts, of which 2mn-2.5mn t CO2e are attributed directly to the facility's intervention, funded with $46.25mn by donor countries to result in a carbon price of between $18.50-23.12/t CO2e. The World Bank is looking at other countries and sectors to apply the lessons learned from the Uzbekistan pilot, its senior climate finance specialist Nuyi Tao said. By Chloe Jardine Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Industry leaders urge realism in green hydrogen push


28/04/24
News
28/04/24

Industry leaders urge realism in green hydrogen push

Dubai, 28 April (Argus) — Hydrogen and its derivatives will have a critically important role to play in accelerating the energy transition but policymakers need to be more realistic given that many of the technologies are still in their infancy, energy industry leaders from the Middle East and Europe said Sunday at a special meeting of the World Economic Forum in the Saudi capital Riyadh. "The market is a challenge," UAE energy minister Suhail al-Mazrouei said. "There is development of the market, but are we there yet? No. At the same time, are we serious about our production? I would say yes. It's between planning something, and getting the result you are aiming for." The UAE is planning to produce 1.4mn t/yr of hydrogen by 2031, more than 70pc of which will be green hydrogen, al-Mazrouei said. In the longer term the country aims to build its hydrogen capacity to 15mn t/yr by 2050. "Clean energy is something we decided to venture into 17 years ago when we began investing in the likes of [UAE state-owned renewables firm] Masdar and started thinking about what would happen after we export the last barrel of oil," UAE energy minister Suhail al-Mazrouei said. "What we did first is regulate and put a strategy of how much to produce." Al-Mazrouei's Saudi counterpart, Prince Abdulaziz bin Salman, voiced similar concerns. "We don't mind partnering with everybody… With the Koreans, the Japanese, our friends the UAE… but there are challenges," he said. "There is a lack of clarity on the policies, a lack of clarity on the receiving or consumer end, a lack of clarity on the incentives and a lack of clarity around what it takes to develop these technologies." Arguably more prohibitive is the "economics" of new energies such as hydrogen, he said. The cost of green hydrogen today is "between roughly $250-300/bl of oil equivalent," Prince Abdulaziz said. "What kind of a business acumen would choose to buy at $250-300/bl?" Al-Mazrouei agreed that costs are too high. "We cannot just treat the consumers as if they are ready to just pay double or triple the price [of conventional energies today]." Let's be serious The EU has set ambitious targets on renewable hydrogen. In 2022, the bloc doubled its 2030 production target to 10mn t/yr, from 5.6mn t/yr previously, and it is also working towards a separate pledge to import another 10mn t/yr by the same date. The production target is an unrealistic goal, according to the Saudi energy minister. "Those projects that have crossed the finishing line only come to 400,000t ꟷ around 4pc of the target," Prince Abdulaziz said. "How is it conceivable that in 2024, only 4pc has been achieved? How can people imagine that 10mn t/yr can be achieved?" TotalEnergies chief executive Patrick Pouyanne, who was speaking on the same panel, was even more blunt in his assessment, describing the EU's target as "impossible" and "not in reality". "Let us recognise that we are still at the infancy stage, and stop speaking about 10mn t, 20mn t, just to the media. It makes no sense," Pouyanne said. "Let's just be serious about it and find the right roadmap. Yes, we probably won't reach our target by 2030, but that's not a problem. It's more important to take steps and spend the money economically, to give them affordable and clean energy." By Nader Itayim Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Business intelligence reports

Get concise, trustworthy and unbiased analysis of the latest trends and developments in oil and energy markets. These reports are specially created for decision makers who don’t have time to track markets day-by-day, minute-by-minute.

Learn more