Mongolia to resume coal exports to China

  • Market: Coal, Coking coal
  • 02/21/20

Mongolia will resume coal exports to China on 3 March, restoring a key source of coking coal imports after a four-week halt.

The border has been closed after a 10 February decision to halt all commodity border crossings in a bid to prevent a further spread of the coronavirus within Mongolia.

All truck drivers delivering coal and other commodities must take all necessary precautionary measures to safeguard their health, including disinfecting after their shifts, authorities stressed yesterday. Arrangements must also be made in advance for quarantine and observation of drivers who are suspected to have contracted the coronavirus.

"We have understood that most logistics services in China are also currently not operating fully because of the coronavirus," said Mongolia's deputy prime minister Olziisaikhany Enkhtuvshin. "We have made this decision to resume coal exports based on the fact that most major industries in China aim to return to full operations starting 2 March."

The reopening of the border was expected by market participants.

"The export of natural resources is a very big contributor to Mongolia's economy," a Beijing-based trader said. "I doubt they could have kept up this export halt for much longer, unless they can bear the damage to their economy."

The reopening of the border should help to ease at least some of the supply tightness that China's steel-producing industries are facing with coking coal, market participants said. The continuing wet season in the main coal-producing region of Queensland in Australia, bad weather and activist protests in Canada, as well as the slow restart of China's domestic coal mining have contributed to supply shortages in China in the past few weeks.

The tighter supplies has driven import coking coal prices higher, with hard mid-volatile coal up by 14pc at $153.85/t cfr China this year and premium hard low-volatile coal up by 11pc to $168/t cfr China.

China obtains about 30-50pc of its coking coal imports each month from Mongolia, making Mongolia an important source of readily available coal for Chinese steel producers. This import growth outpaced Australia last year. Mongolian coking coal imports rose to 33.8mn t in 2019 from 27.7mn t in 2018, while Australian imports rose to 30.9mn t from 28.2mn t in 2018.


Sharelinkedin-sharetwitter-sharefacebook-shareemail-share

Related news posts

Argus illuminates the markets by putting a lens on the areas that matter most to you. The market news and commentary we publish reveals vital insights that enable you to make stronger, well-informed decisions. Explore a selection of news stories related to this one.

News
02/21/24

Japan sees potential for increased summer power demand

Japan sees potential for increased summer power demand

Tokyo, 21 February (Argus) — Reduced nuclear availability and firm electricity demand in Japan is lifting the potential for increased consumption of thermal power generation fuels this summer. The Japan Meteorological Agency forecasts a 50-70pc probability of temperatures during June-August 2024 rising above the 30-year average in all parts of Japan. Average temperatures in Japan's major cities, such as Tokyo, Osaka and Nagoya, during June-August 2023 were higher than the long-term average. This implies that the country is likely to face similar summer temperatures as last year. Nuclear power output is projected to fall and boost the country's thermal power demand during summer. The operating capacity of nuclear power plants could fall to an average of 7,562MW during June-August from average actual operating capacity of 9,563MW in the same period in 2023, according to Argus calculations based on data from Japan's Agency for Natural Resources and Energy and notices on the Japan Electric Power Exchange website. Hotter weather across the country in 2023 failed to lift thermal fuel demand, with power demand in Japan's 10 service areas averaging 104.3GW for June-August, down by 1.2pc from the same period a year earlier, according to nationwide transmission system operator the Organisation for Cross-regional Co-ordination of Transmission Operators. The rainy season normally boosts electricity demand but sunlight hours were unusually longer in 2023 compared with 2022 that capped power use in June and July, as it boosted solar power generation to 4,645GWh in from 4,320GWh in the same period in 2022. Continued energy saving efforts also helped to cut electricity use. Japan's LNG consumption for power generation totalled 9.8mn t during June-August 2023, according to the trade and industry ministry. Coal use totalled 26.5mn t, while oil consumption — including fuel oil, diesel and crude — was 57,651 b/d. LPG use was 6,014t. By Nanami Oki and Reina Maeda Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

Read More
News

BMA's Australian coal at low end of output target


02/20/24
News
02/20/24

BMA's Australian coal at low end of output target

Sydney, 20 February (Argus) — BHP Mitsubishi Alliance's (BMA) Australian coal production is trending towards the bottom half of its decade-low guidance for the 2023-24 fiscal year to 30 June, as heavy rainfall disrupts production. BMA, which is 50pc owned by Australian resources firm BHP and 50pc by Japanese trading house Mitsubishi, cut its 2023-24 guidance to 46mn-50mn t of metallurgical coal in January from the previous guidance of 56mn-62mn t issued in July. But heavy rainfall so far this year means it is trending towards the lower half, according to BHP chief executive Mike Henry. The firm was already operating on low inventories because of higher than average rainfall in 2022, as the La Nina weather pattern delivered increased rainfall to the east coast of Australia. This meant that heavy rainfall in 2023 and early 2024 has quickly flown through into disruptions to production, although the firm is working on building inventories through the system, Henry added. The wet end to 2023 and start of 2024 was not expected because of the El Nino weather phenomenon that typically drives drought conditions on the east coast . The atypical wet weather has prompted US-Australian coal mining firm Coronado to factor in more heavy rainfall disruptions in Queensland into its 2024 guidance . Around 3mn-4.5mn t of BHP's cut in BMA guidance is because of the planned sale to Australian mining firm Whitehaven of its Blackwater and Daunia coking and thermal coal mines in Queensland, which is on track to be completed on 2 April. BHP estimates that the sale will increase its proportion of premium hard coking coal so 86pc of its Queensland coal sales from 64pc now and 55pc prior to its sale of its 80pc stake of BHP Mitsui Corporation to Australian independent Stanmore in 2022 . Henry remains optimistic on the outlook for coking coal prices, with demand growth from India and a muted supply response. But he argues that an effective tax rate of 62pc in Queensland following higher royalty rates imposed in July 2022 makes it an unattractive investment opportunity. BHP despite the lower production outlook retained BMA's cost guidance, which it revised in January, for 2023-24 at $110-116/t. The Argus premium hard coking coal price averaged $295.86/t in 2023, down from $365.60/t in 2022 but up from $223.16/t in 2021 and $124.26/t in 2020. By Jo Clarke Australian metallurgical coal prices ($/t) Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

More rainfall cuts Coronado's Australian coal outlook


02/20/24
News
02/20/24

More rainfall cuts Coronado's Australian coal outlook

Sydney, 20 February (Argus) — US-Australian coal producer Coronado Coal is factoring in new Australian wet weather patterns in its unambitious saleable coal guidance of 16.4mn-17.2mn t for 2024. Wetter than expected weather in Queensland in 2023 and port delays contributed to Coronado selling 15.8mn t of coal in 2023 , missing its revised guidance of 16.2mn-16.4mn t . Coronado is investing to expand metallurgical coal sales from Australia and the US, yet the 2024 guidance compares with the original 2023 target of 16.8mn-17.2mn t set in February 2023 . This is partly to allow growth plans to push production across Australia and the US to 20.5mn t/yr over the next couple of years. But it also reflects the firm allowing for extra disruption from heavy rainfall at its Curragh operation in Queensland, rather than using a straight 10-year average, as has been standard. After a very wet 2020-22, associated with the La Nina weather pattern, 2023 was meant to be a drier year dominated by an El Nino trend that usually brings drier than average weather to the east coast of Australia. But the coal mining regions in Queensland have had a wet 2023, with particularly heavy rainfall from November 2023 into 2024. This is forcing mining firms to reconsider their production and sales expectations from mines in Queensland. Australian coking coal exports for 2023 were 151.28mn t , which is the least shipped since 2012, down from 160.53mn t in 2022 and a peak of 186.83mn t in 2016, according to Australian Bureau of Statistics data supplied by GTT. This was despite firmer prices in 2023, particularly for high-grade metallurgical coal sold from Queensland, that should have driven producers to increase supplies. Demand for Australian coking coal will continue to grow driven by India but supplies remain constrained, according to Coronado chief financial officer Gerhard Ziems. Coronado reported a profit of $156.1mn in 2023, down from $771.7mn in 2022, but maintained a modest dividend payout as it looks to deploy capital to grow its capacity to supply the metallurgical coal business. It has internal growth plans, including expanding the Curragh metallurgical and thermal coal mine in Queensland to 13.5mn t/yr in 2025 and its US coal mines to 7mn t in 2025. The Argus premium hard coking coal price averaged $295.86/t in 2023, down from $365.60/t in 2022 but up from $223.16/t in 2021 and $124.26/t in 2020. By Jo Clarke Australian metallurgical coal prices ($/t) Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

JETP needs to be scaled up to be effective: Report


02/16/24
News
02/16/24

JETP needs to be scaled up to be effective: Report

Singapore, 16 February (Argus) — The Just Energy Transition Partnerships (JETPs) — intended to help emerging economies' energy transition efforts — need to be scaled up to achieve their full potential, according to a research report. The JETPs have been "long on promise, but so far short on implementation," according to the Scaling the JETP model report by US research firm the Rockefeller Foundation and US-based environmental advocacy group the Environmental Defense Fund. The JETP is a financing mechanism led by the International Partners Group (IPG) — formed from various donor countries — and the Glasgow Financial Alliance for Net Zero, a coalition of major financial institutions. The first three JETP deals in South Africa, Indonesia and Vietnam were based on enabling a just transition from coal to clean power, while the latest deal in Senegal focused on accelerating access to clean energy through deploying renewables. But the deals only cover a small portion of total investment needed to achieve net zero power sector emissions, and there has not been enough "new and additional" concessionary capital after the initial "fanfare" when partnerships are announced. There has been insufficient access to technical, planning and modelling capacities within countries, and also a lack of clarity regarding the roles of involved multilateral development banks (MDBs). The report suggests four pathways to address and overcome barriers to scale, as well as allow the model to reach its full potential. The first is the development of nationally-owned "country platforms", which are institutional venues that would allow for more structured dialogue between government officials, technical partners and financers. Such a platform would be able to oversee the development of a "nationally appropriate investment plan," states the report. There are countries that have expressed interest in support packages but currently have no access to them, such as Kenya, Thailand, Mexico and Kazakhstan, according to the report. The second pathway suggests that these countries could come together and announce their interest in such JETP-like deals. This would send a signal to potential support partners and illustrate that there is enough demand to require a reformation of the international financial system, and the countries could collectively set out more "coherent and credible investment plans," states the report. The third pathway sees more involvement from MDBs, especially if the aforementioned country platforms are successful, as the leadership of these banks will be necessary. The MDBs bring "relevant capabilities in technical sectoral expertise, country-led engagement, government relationship management, [and the] ability to navigate diverse financing partners." The MDBs could help to co-ordinate between providers of capital and help to design investment plans. Lastly, the IPG needs to expand and increase the donor pool so that there is more concessionary capital, the lack of which is the biggest constraint that deals are currently facing. JETP packages would also be more successful if consolidated offers were made by the group, instead of each IPG member making a discrete offer. By Prethika Nair Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.

News

Australian coal plant blast cause 'complex': CS Energy


02/14/24
News
02/14/24

Australian coal plant blast cause 'complex': CS Energy

Sydney, 14 February (Argus) — An explosion at the 1,586MW Callide coal-fired power plant in Australia's Queensland state in May 2021 was the result of the simultaneous failure of key electrical equipment and system back-ups in a "complex series of events that could not have been anticipated", Queensland state-controlled utility CS Energy said. A technical report on the causes of the incident released on 13 February has determined that the trigger was a collapse of voltage in the direct current (DC) system of the 420MW Callide C4 unit, just as a new battery charger was being connected to the facility. The unit turbine tripped because of the loss of supplies but remained connected to the grid. The turbine generator continued to spin with the loss of critical systems, directly leading to its explosion, CS Energy said. The blast led to blackouts in large parts of the state , including some of its largest coal ports, and boosted gas-fired generation and electricity prices over the 2021 winter. The report is based on CS Energy's assessment of the incident including contribution from third-party experts such as consultancy Aurecon and independent investigator Sean Brady, who is yet to complete a final assessment, the utility said. CS Energy said it has modified the design of the Callide C plant, which also comprises the 466MW C3 unit, as the original design did not enable two batteries being connected to the same DC supply system. This will ensure a battery is always connected, backing critical protection circuits, the utility said. It has also made several other modifications to prevent a similar event from happening again. The utility operates the Callide C joint venture on behalf of IG Power, formerly known as InterGen Australia. The C4 unit is scheduled to return partially on 30 June 2024, pushed back from previous schedules , while the C3 unit is expected to reconnect to the grid partially on 29 February, reaching full capacity on 31 March. The C3 unit went back on line already in winter 2021 but suffered a structural failure of the cooling plant in October 2022 . CS Energy also operates and fully owns the 700MW Callide B plant, which is currently operational. By Juan Weik Send comments and request more information at feedback@argusmedia.com Copyright © 2024. Argus Media group . All rights reserved.